IAC logo
IAC Assessment: WI0129
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0129
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1991
Principal Product STATIONERY/TABLET PAPER
NAICS n/a
SIC 2678 - Stationery Products
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 80,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,905 3,227,140 kWh $0.05
Natural Gas $69,360 15,633 MMBtu $4.44
TOTAL ENERGY COSTS $228,265
RECOMMENDED SAVINGS* $11,919 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$3,952
Cost:
$5,600
- - $3,952 890 - - -
-
kWh
$3,952
890
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,522
Cost:
-
$2,722 - - - $(-200) - $2,722
-
kWh
-
-
MMBtu
$(-200)
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,859
Cost:
-
$2,159 - - - $(-300) - $2,159
-
kWh
-
-
MMBtu
$(-300)
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,215
Cost:
$1,280
$1,215 24,619 - - - - $1,215
24,619
kWh
-
-
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$770
Cost:
$238
$770 15,826 - - - - $770
15,826
kWh
-
-
MMBtu
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$767
Cost:
$600
- - $767 173 - - -
-
kWh
$767
173
MMBtu
-
-
$
07: 2.6232 INSTALL SET-BACK TIMERS Savings:
$433
Cost:
$200
$433 8,792 - - - - $433
8,792
kWh
-
-
MMBtu
-
-
$
08: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$331
Cost:
-
$331 6,741 - - - - $331
6,741
kWh
-
-
MMBtu
-
-
$
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$70
Cost:
-
$70 1,465 - - - - $70
1,465
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$11,919
Cost:
$7,918
$7,700 57,443 $4,719 1,063 $(-500) - $7,700
57,443
kWh
$4,719
1,063
MMBtu
$(-500)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes