IAC logo
IAC Assessment: WI0130
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0130
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1991
Principal Product FASTENERS
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 0
Annual Production 1,600,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $500,369 7,327,374 kWh $0.07
Natural Gas $228,070 88,719 MMBtu $2.57
TOTAL ENERGY COSTS $728,439
RECOMMENDED SAVINGS* $46,160 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$33,213
Cost:
$20,000
$5,093 74,736 - - $28,120 - $5,093
74,736
kWh
-
-
MMBtu
$28,120
-
$
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$5,028
Cost:
-
$5,028 73,564 - - - - $5,028
73,564
kWh
-
-
MMBtu
-
-
$
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$4,776
Cost:
-
$4,776 70,047 - - - - $4,776
70,047
kWh
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,068
Cost:
$3,100
- - $1,068 416 - - -
-
kWh
$1,068
416
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,149
Cost:
$1,920
$1,149 16,706 - - - - $1,149
16,706
kWh
-
-
MMBtu
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$565
Cost:
$700
$673 9,965 $(-108) (-42) - - $673
9,965
kWh
$(-108)
(-42)
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$340
Cost:
-
$340 4,982 - - - - $340
4,982
kWh
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21
Cost:
$17
$21 293 - - - - $21
293
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$46,160
Cost:
$25,737
$17,080 250,293 $960 374 $28,120 - $17,080
250,293
kWh
$960
374
MMBtu
$28,120
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes