Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1992
Principal Product VALVES FOR A/C REFRIGER.
NAICS n/a
SIC 3491 - Industrial Valves
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 4,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $166,660 1,910,317 kWh $0.09
Natural Gas $35,045 10,385 MMBtu $3.37
TOTAL ENERGY COSTS $201,705
RECOMMENDED SAVINGS* $8,729 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,889
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,830
Cost:
$314
$(-72) (-879) $1,902 567 - - $(-72)
(-879)
kWh
$1,902
567
MMBtu
-
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,233
Cost:
$800
$1,233 14,068 - - - - $1,233
14,068
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$249
Cost:
$244
$328 3,810 - - $(-79) - $328
3,810
kWh
-
-
MMBtu
$(-79)
-
$
04: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,215
Cost:
-
$1,215 14,068 - - - - $1,215
14,068
kWh
-
-
MMBtu
-
-
$
05: 2.2514 COVER OPEN TANKS Savings:
$967
Cost:
$500
- - $967 287 - - -
-
kWh
$967
287
MMBtu
-
-
$
06: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$1,208
Cost:
$4,293
- - $1,208 358 - - -
-
kWh
$1,208
358
MMBtu
-
-
$
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$658
Cost:
-
$788 9,086 $(-130) (-39) - - $788
9,086
kWh
$(-130)
(-39)
MMBtu
-
-
$
08: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$601
Cost:
$525
$601 7,034 - - - - $601
7,034
kWh
-
-
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$498
Cost:
-
$498 5,862 - - - - $498
5,862
kWh
-
-
MMBtu
-
-
$
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$270
Cost:
$400
- - $270 80 - - -
-
kWh
$270
80
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$8,729
Cost:
$7,076
$4,591 53,049 $4,217 1,253 $(-79) - $4,591
53,049
kWh
$4,217
1,253
MMBtu
$(-79)
-
$
TOTAL IMPLEMENTED Savings:
$5,889
Cost:
$6,576
$2,588 29,895 $3,380 1,005 $(-79) - $2,588
29,895
kWh
$3,380
1,005
MMBtu
$(-79)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes