IAC Assessment: WI0186
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0186
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1993
Principal Product Small Motors
NAICS n/a
SIC 3694 - Engine Electrical Equipment
Sales $10,000,000-$50,000,000
# of Employees 407
Plant Area (Sq.Ft.) 150,000
Annual Production 0 Units
Production Hrs. Annual 2,310
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $335,322 4,424,385 kWh $0.08
Natural Gas $40,129 12,025 MMBtu $3.34
TOTAL ENERGY COSTS $375,451
RECOMMENDED SAVINGS* $33,475 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$14,209
Cost:
$15,000
$14,209 247,655 - - $14,209
247,655
kWh
-
-
MMBtu
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$12,375
Cost:
-
- - $12,375 3,705 -
-
kWh
$12,375
3,705
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,035
Cost:
$10,375
$4,035 53,341 - - $4,035
53,341
kWh
-
-
MMBtu
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,100
Cost:
$525
$1,100 14,654 - - $1,100
14,654
kWh
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$211
Cost:
$372
$211 2,931 - - $211
2,931
kWh
-
-
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$567
Cost:
$700
$622 8,206 $(-55) (-35) $622
8,206
kWh
$(-55)
(-35)
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$353
Cost:
$1,280
$353 4,689 - - $353
4,689
kWh
-
-
MMBtu
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$303
Cost:
$1,200
- - $303 91 -
-
kWh
$303
91
MMBtu
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$322
Cost:
$200
$322 23,740 - - $322
23,740
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$33,475
Cost:
$29,652
$20,852 355,216 $12,623 3,761 $20,852
355,216
kWh
$12,623
3,761
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas