IAC logo
IAC Assessment: WI0210
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0210
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1994
Principal Product Remanufactured starters and alternators
NAICS n/a
SIC 3694 - Engine Electrical Equipment
Sales $5,000,000-$10,000,000
# of Employees 150
Plant Area (Sq.Ft.) 48,000
Annual Production 276,000 Pieces
Production Hrs. Annual 2,125
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,280 686,987 kWh $0.12
Natural Gas $31,088 6,224 MMBtu $4.99
TOTAL ENERGY COSTS $113,368
RECOMMENDED SAVINGS* $18,818 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,178
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$5,868
Cost:
$1,400
- - $5,868 1,176 - - -
-
kWh
$5,868
1,176
MMBtu
-
-
$
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$5,575
Cost:
$500
- - - - $5,575 - -
-
kWh
-
-
MMBtu
$5,575
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,328
Cost:
$5,154
$3,328 27,843 - - - - $3,328
27,843
kWh
-
-
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$625
Cost:
$375
$625 5,275 - - - - $625
5,275
kWh
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,471
Cost:
$2,200
- - $1,471 295 - - -
-
kWh
$1,471
295
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,288
Cost:
$1,920
$1,288 10,844 - - - - $1,288
10,844
kWh
-
-
MMBtu
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$551
Cost:
$500
- - $551 110 - - -
-
kWh
$551
110
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$112
Cost:
-
$112 879 - - - - $112
879
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$18,818
Cost:
$12,049
$5,353 44,841 $7,890 1,581 $5,575 - $5,353
44,841
kWh
$7,890
1,581
MMBtu
$5,575
-
$
TOTAL IMPLEMENTED Savings:
$9,178
Cost:
$6,020
$1,288 10,844 $7,890 1,581 - - $1,288
10,844
kWh
$7,890
1,581
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes