IAC logo
IAC Assessment: WI0215
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0215
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1994
Principal Product Plating of silver, gold, nickel, and tin
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 40,000
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $92,367 1,443,728 kWh $0.06
Natural Gas $35,325 7,295 MMBtu $4.84
TOTAL ENERGY COSTS $127,692
RECOMMENDED SAVINGS* $31,095 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,077
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.3312 INSTALL EFFICIENT RECTIFIERS Savings:
$17,153
Cost:
$28,400
$17,153 291,032 - - - - $17,153
291,032
kWh
-
-
MMBtu
-
-
lb
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,840
Cost:
$800
- - $1,840 360 - - -
-
kWh
$1,840
360
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,325
Cost:
$1,973
$1,325 15,533 - - - - $1,325
15,533
kWh
-
-
MMBtu
-
-
lb
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$848
Cost:
$1,400
- - $848 166 - - -
-
kWh
$848
166
MMBtu
-
-
lb
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$229
Cost:
$500
- - $229 45 - - -
-
kWh
$229
45
MMBtu
-
-
lb
06: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$9,700
Cost:
$38,000
- - - - $9,700 67,700 -
-
kWh
-
-
MMBtu
$9,700
67,700
lb
TOTAL RECOMMENDED Savings:
$31,095
Cost:
$71,073
$18,478 306,565 $2,917 571 $9,700 67,700 $18,478
306,565
kWh
$2,917
571
MMBtu
$9,700
67,700
lb
TOTAL IMPLEMENTED Savings:
$1,077
Cost:
$1,900
- - $1,077 211 - - -
-
kWh
$1,077
211
MMBtu
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)