IAC logo
IAC Assessment: WI0217
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0217
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1994
Principal Product Gaskets for fluid control applications
NAICS n/a
SIC 3053 - Gaskets, Packing And Sealing Devices
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 30,000
Annual Production 250,000 Pounds
Production Hrs. Annual 4,250
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,576 525,791 kWh $0.09
Natural Gas $14,240 2,530 MMBtu $5.63
TOTAL ENERGY COSTS $62,816
RECOMMENDED SAVINGS* $9,269 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $768
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Consumption Electricity Usage Natural Gas Water Consumption
$ kWh $ MMBtu $ Tgal
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,885
Cost:
$800
- - $2,885 513 - - -
-
kWh
$2,885
513
MMBtu
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,876
Cost:
$2,250
$1,876 20,223 - - - - $1,876
20,223
kWh
-
-
MMBtu
-
-
Tgal
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,735
Cost:
-
$1,735 18,757 - - - - $1,735
18,757
kWh
-
-
MMBtu
-
-
Tgal
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$768
Cost:
$1,400
$768 8,206 - - - - $768
8,206
kWh
-
-
MMBtu
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$624
Cost:
$1,099
$624 6,741 - - - - $624
6,741
kWh
-
-
MMBtu
-
-
Tgal
06: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$1,381
Cost:
$8,000
$(-487) (-5,275) - - $1,868 - $(-487)
(-5,275)
kWh
-
-
MMBtu
$1,868
-
Tgal
TOTAL RECOMMENDED Savings:
$9,269
Cost:
$13,549
$4,516 48,652 $2,885 513 $1,868 - $4,516
48,652
kWh
$2,885
513
MMBtu
$1,868
-
Tgal
TOTAL IMPLEMENTED Savings:
$768
Cost:
$1,400
$768 8,206 - - - - $768
8,206
kWh
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Consumption Electricity Usage Natural Gas Water Consumption