IAC logo
IAC Assessment: WI0227
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0227
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1995
Principal Product Molded Rubber
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 73
Plant Area (Sq.Ft.) 102,000
Annual Production 500,000 Pounds
Production Hrs. Annual 6,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $155,150 1,832,356 kWh $0.08
Natural Gas $55,721 15,214 MMBtu $3.66
TOTAL ENERGY COSTS $256,571
RECOMMENDED SAVINGS* $24,526 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,083
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ MMBtu $ Tgal $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,083
Cost:
$4,041
$4,083 48,359 - - - - - - $4,083
48,359
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
02: 2.7314 REDUCE VENTILATION AIR Savings:
$603
Cost:
$1,000
$70 879 $533 146 - - - - $70
879
kWh
$533
146
MMBtu
-
-
Tgal
-
-
lb
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,090
Cost:
$100
$1,090 12,896 - - - - - - $1,090
12,896
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$578
Cost:
-
$578 6,741 - - - - - - $578
6,741
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$293
Cost:
$640
$293 3,517 - - - - - - $293
3,517
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
06: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$16,579
Cost:
$22,000
- - - - $16,579 10,000,000 - - -
-
kWh
-
-
MMBtu
$16,579
10,000,000
Tgal
-
-
lb
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,300
Cost:
-
- - - - - - $1,300 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$1,300
-
lb
TOTAL RECOMMENDED Savings:
$24,526
Cost:
$27,781
$6,114 72,392 $533 146 $16,579 10,000,000 $1,300 - $6,114
72,392
kWh
$533
146
MMBtu
$16,579
10,000,000
Tgal
$1,300
-
lb
TOTAL IMPLEMENTED Savings:
$4,083
Cost:
$4,041
$4,083 48,359 - - - - - - $4,083
48,359
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb
Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz)