Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 1995 |
Principal Product | Sheet Metal products |
NAICS | n/a |
SIC | 2295 - Coated Fabrics, Not Rubberized |
Sales | $10,000,000-$50,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 35,000 |
Annual Production | 300,000 Pieces |
Production Hrs. Annual | 4,500 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $33,460 | 361,665 | kWh | $0.09 |
Natural Gas | $24,877 | 5,408 | MMBtu | $4.60 |
TOTAL ENERGY COSTS | $42,987 | |||
RECOMMENDED SAVINGS* | $22,972 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Water Consumption | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,446 Cost: $90 |
$6,446 | 69,754 | - | - | - | - | - | - |
$6,446 69,754 kWh |
- - MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $307 Cost: $1,280 |
$307 | 3,224 | - | - | - | - | - | - |
$307 3,224 kWh |
- - MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $3,143 Cost: $400 |
- | - | $3,143 | 683 | - | - | - | - |
- - kWh |
$3,143 683 MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,120 Cost: - |
$1,120 | 12,016 | - | - | - | - | - | - |
$1,120 12,016 kWh |
- - MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,079 Cost: $1,090 |
$1,079 | 11,723 | - | - | - | - | - | - |
$1,079 11,723 kWh |
- - MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $331 Cost: $1,080 |
$331 | 3,517 | - | - | - | - | - | - |
$331 3,517 kWh |
- - MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $896 Cost: $725 |
- | - | $896 | 195 | - | - | - | - |
- - kWh |
$896 195 MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $6,600 Cost: $8,500 |
- | - | - | - | $6,600 | 30 | - | - |
- - kWh |
- - MMBtu |
$6,600 30 lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.1291 ELIMINATE PRACTICE OF MIXING WASTE STREAMS |
Savings: $3,050 Cost: $4,000 |
- | - | - | - | - | - | $3,050 | - |
- - kWh |
- - MMBtu |
- - lb |
$3,050 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,972 Cost: $17,165 |
$9,283 | 100,234 | $4,039 | 878 | $6,600 | 30 | $3,050 | - | $9,283 100,234 kWh |
$4,039 878 MMBtu |
$6,600 30 lb |
$3,050 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Water Consumption | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Water Consumption |