IAC logo
IAC Assessment: WI0271
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0271
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1996
Principal Product Mining Locomotives, Industrial Blow Molding Machines
NAICS n/a
SIC 3532 - Mining Machinery
Sales $10,000,000-$50,000,000
# of Employees 87
Plant Area (Sq.Ft.) 63,000
Annual Production 62 Pieces
Production Hrs. Annual 2,294
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,701 473,916 kWh $0.10
Electricity Demand $29,431 2,406 kW-months/year $12.23
Electricity Fees $(-364) - $ -
Natural Gas $9,413 2,754 MMBtu $3.42
TOTAL ENERGY COSTS $88,181
RECOMMENDED SAVINGS* $16,904 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,442
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (haz) Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (haz) Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
01: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$8,700
Cost:
-
- - - - - - - - $8,700 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$8,700
-
lb
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,497
Cost:
$700
$819 18,757 $1,898 148 $(-220) (-64) - - - - - - $819
18,757
kWh
$1,898
148
kW-months/year
$(-220)
(-64)
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$1,508
Cost:
$500
- - - - - - - - - - $1,508 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$1,508
-
$
04: 2.7251 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF Savings:
$1,202
Cost:
$3,900
$625 14,361 $577 45 - - - - - - - - $625
14,361
kWh
$577
45
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,130
Cost:
$1,900
- - - - $1,130 339 - - - - - - -
-
kWh
-
-
kW-months/year
$1,130
339
MMBtu
-
-
gal
-
-
lb
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$125
Cost:
$250
- - - - $125 37 - - - - - - -
-
kWh
-
-
kW-months/year
$125
37
MMBtu
-
-
gal
-
-
lb
-
-
$
07: 3.8124 INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION Savings:
$873
Cost:
-
- - - - - - $873 195 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$873
195
gal
-
-
lb
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$280
Cost:
$600
$280 2,052 - - - - - - - - - - $280
2,052
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$172
Cost:
$85
$80 1,758 $92 7 - - - - - - - - $80
1,758
kWh
$92
7
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$124
Cost:
$60
$62 1,465 $62 5 - - - - - - - - $62
1,465
kWh
$62
5
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$293
Cost:
$640
$108 2,345 $185 14 - - - - - - - - $108
2,345
kWh
$185
14
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$16,904
Cost:
$8,635
$1,974 40,738 $2,814 219 $1,035 312 $873 195 $8,700 - $1,508 - $1,974
40,738
kWh
$2,814
219
kW-months/year
$1,035
312
MMBtu
$873
195
gal
$8,700
-
lb
$1,508
-
$
TOTAL IMPLEMENTED Savings:
$10,442
Cost:
$1,385
$530 7,620 $339 26 - - $873 195 $8,700 - - - $530
7,620
kWh
$339
26
kW-months/year
-
-
MMBtu
$873
195
gal
$8,700
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (haz) Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (haz) Primary Raw Material