IAC logo
IAC Assessment: WI0277
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0277
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1996
Principal Product Corrugated containers
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 170,000
Annual Production 480,000 Thousand Feet
Production Hrs. Annual 4,250
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $171,903 3,779,308 kWh $0.05
Electricity Demand $123,953 10,238 kW-months/year $12.11
Electricity Fees $(-3,976) - $ -
Natural Gas $114,772 38,400 MMBtu $2.99
TOTAL ENERGY COSTS $412,452
RECOMMENDED SAVINGS* $44,670 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,818
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$18,642
Cost:
$10,000
$(-221) (-4,689) - - $18,863 6,309 - - $(-221)
(-4,689)
kWh
-
-
kW-months/year
$18,863
6,309
MMBtu
-
-
lb
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,122
Cost:
$1,600
- - - - $6,122 2,048 - - -
-
kWh
-
-
kW-months/year
$6,122
2,048
MMBtu
-
-
lb
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,800
Cost:
-
- - - - - - $5,800 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,800
-
lb
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,365
Cost:
$9,500
$652 (-13,775) - - $3,713 1,242 - - $652
(-13,775)
kWh
-
-
kW-months/year
$3,713
1,242
MMBtu
-
-
lb
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,538
Cost:
$1,642
$1,384 29,015 $1,154 91 - - - - $1,384
29,015
kWh
$1,154
91
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,245
Cost:
$640
$1,376 28,722 $869 68 - - - - $1,376
28,722
kWh
$869
68
kW-months/year
-
-
MMBtu
-
-
lb
07: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$1,948
Cost:
$3,000
- - - - $1,948 651 - - -
-
kWh
-
-
kW-months/year
$1,948
651
MMBtu
-
-
lb
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,453
Cost:
$500
- - - - $1,453 486 - - -
-
kWh
-
-
kW-months/year
$1,453
486
MMBtu
-
-
lb
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,309
Cost:
$1,849
$729 15,240 $580 46 - - - - $729
15,240
kWh
$580
46
kW-months/year
-
-
MMBtu
-
-
lb
10: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$248
Cost:
$700
$248 5,275 - - - - - - $248
5,275
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$44,670
Cost:
$29,431
$4,168 59,788 $2,603 205 $32,099 10,736 $5,800 - $4,168
59,788
kWh
$2,603
205
kW-months/year
$32,099
10,736
MMBtu
$5,800
-
lb
TOTAL IMPLEMENTED Savings:
$5,818
Cost:
$10,000
$652 (-13,775) - - $5,166 1,728 - - $652
(-13,775)
kWh
-
-
kW-months/year
$5,166
1,728
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)