IAC Assessment: WI0291
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0291
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1997
Principal Product Custom Sheet Metal Products
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 245
Plant Area (Sq.Ft.) 300,000
Annual Production 0 Units
Production Hrs. Annual 6,210
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $135,818 5,492,380 kWh $0.02
Electricity Demand $120,577 14,780 kW-months/year $8.16
Electricity Fees $4,750 - $ -
Natural Gas $111,568 32,973 MMBtu $3.38
TOTAL ENERGY COSTS $558,238
RECOMMENDED SAVINGS* $60,753 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,021
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 4.452 ELIMINATE SHIFT Savings:
$23,000
Cost:
$5,000
- - - - - - - - $23,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$23,000
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,229
Cost:
$20,892
$5,013 191,970 $2,216 278 - - - - - - $5,013
191,970
kWh
$2,216
278
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,099
Cost:
$360
$4,922 188,453 $2,177 273 - - - - - - $4,922
188,453
kWh
$2,177
273
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,451
Cost:
$10,000
- - - - $3,451 1,021 - - - - -
-
kWh
-
-
kW-months/year
$3,451
1,021
MMBtu
-
-
lb
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,429
Cost:
$740
$1,187 45,428 $1,242 156 - - - - - - $1,187
45,428
kWh
$1,242
156
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,693
Cost:
-
$1,693 64,771 - - - - - - - - $1,693
64,771
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$15,852
Cost:
-
- - - - - - $15,852 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$15,852
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$60,753
Cost:
$36,992
$12,815 490,622 $5,635 707 $3,451 1,021 $15,852 - $23,000 - $12,815
490,622
kWh
$5,635
707
kW-months/year
$3,451
1,021
MMBtu
$15,852
-
lb
$23,000
-
$
TOTAL IMPLEMENTED Savings:
$16,021
Cost:
$21,252
$11,628 445,194 $4,393 551 - - - - - - $11,628
445,194
kWh
$4,393
551
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes