IAC Assessment: WI0297
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0297
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1997
Principal Product Wallcoverings
NAICS n/a
SIC 2679 - Converted Paper Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 41
Plant Area (Sq.Ft.) 28,000
Annual Production 48,000,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,627 991,208 kWh $0.03
Electricity Demand $15,059 2,716 kW-months/year $5.54
Electricity Fees $420 - $ -
Natural Gas $23,359 5,646 MMBtu $4.14
TOTAL ENERGY COSTS $85,640
RECOMMENDED SAVINGS* $34,140 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,361
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.126 INSTALL SENSORS TO DETECT DEFECTS Savings:
$30,000
Cost:
$36,750
- - - - - - - - $30,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$30,000
-
$
02: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$1,631
Cost:
-
- - - - - - - - $1,631 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,631
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,100
Cost:
$150
- - - - $1,100 266 - - - - -
-
kWh
-
-
kW-months/year
$1,100
266
MMBtu
-
-
$
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$787
Cost:
$400
- - - - $787 190 - - - - -
-
kWh
-
-
kW-months/year
$787
190
MMBtu
-
-
$
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$261
Cost:
-
- - - - - - $261 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$261
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$261
Cost:
-
$205 6,448 $56 10 - - - - - - $205
6,448
kWh
$56
10
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$100
Cost:
$150
$100 3,224 - - - - - - - - $100
3,224
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$34,140
Cost:
$37,450
$305 9,672 $56 10 $1,887 456 $261 - $31,631 - $305
9,672
kWh
$56
10
kW-months/year
$1,887
456
MMBtu
$261
-
$
$31,631
-
$
TOTAL IMPLEMENTED Savings:
$31,361
Cost:
$36,900
- - - - $1,100 266 $261 - $30,000 - -
-
kWh
-
-
kW-months/year
$1,100
266
MMBtu
$261
-
$
$30,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material