IAC Assessment: WI0305
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0305
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1997
Principal Product Compressors, pressure vessels, and package systems
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $50,000,000-$100,000,000
# of Employees 325
Plant Area (Sq.Ft.) 400,000
Annual Production 2,100 Pieces
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,669 6,859,613 kWh $0.02
Electricity Demand $115,208 15,296 kW-months/year $7.53
Electricity Fees $5,666 - $ -
Natural Gas $272,121 54,930 MMBtu $4.95
TOTAL ENERGY COSTS $651,925
RECOMMENDED SAVINGS* $98,212 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,690
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ gal $ lb $ $ $ $ $ $ $ $
01: 4.6210 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$28,500
Cost:
$4,500
- - - - - - - - - - $30,000 - - - - - $(-1,500) - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
gal
-
-
lb
$30,000
-
$
-
-
$
-
-
$
$(-1,500)
-
$
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$21,896
Cost:
$55,000
$(-164) (-6,741) - - - - - - - - $(-1,500) - $23,560 - - - - - $(-164)
(-6,741)
kWh
-
-
kW-months/year
-
-
gal
-
-
gal
-
-
lb
$(-1,500)
-
$
$23,560
-
$
-
-
$
-
-
$
03: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$16,529
Cost:
$30,000
- - - - - - $21,232 2,000 $(-543) (-820) $(-2,860) - - - $(-1,300) - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$21,232
2,000
gal
$(-543)
(-820)
lb
$(-2,860)
-
$
-
-
$
$(-1,300)
-
$
-
-
$
04: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$14,956
Cost:
$1,000
- - - - - - - - - - - - - - $14,956 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
$
$14,956
-
$
-
-
$
05: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$9,755
Cost:
$12,000
- - - - $19,305 74,250 - - $(-8,250) (-33,825) $(-1,300) - - - - - - - -
-
kWh
-
-
kW-months/year
$19,305
74,250
gal
-
-
gal
$(-8,250)
(-33,825)
lb
$(-1,300)
-
$
-
-
$
-
-
$
-
-
$
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$5,342
Cost:
$10,000
- - $5,342 672 - - - - - - - - - - - - - - -
-
kWh
$5,342
672
kW-months/year
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,234
Cost:
$740
$676 27,843 $558 70 - - - - - - - - - - - - - - $676
27,843
kWh
$558
70
kW-months/year
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$98,212
Cost:
$113,240
$512 21,102 $5,900 742 $19,305 74,250 $21,232 2,000 $(-8,793) (-34,645) $24,340 - $23,560 - $13,656 - $(-1,500) - $512
21,102
kWh
$5,900
742
kW-months/year
$19,305
74,250
gal
$21,232
2,000
gal
$(-8,793)
(-34,645)
lb
$24,340
-
$
$23,560
-
$
$13,656
-
$
$(-1,500)
-
$
TOTAL IMPLEMENTED Savings:
$44,690
Cost:
$6,240
$676 27,843 $558 70 - - - - - - $30,000 - - - $14,956 - $(-1,500) - $676
27,843
kWh
$558
70
kW-months/year
-
-
gal
-
-
gal
-
-
lb
$30,000
-
$
-
-
$
$14,956
-
$
$(-1,500)
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ gal $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost