IAC Assessment: WI0306
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0306
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1997
Principal Product Trailer and marine accessories
NAICS n/a
SIC 3465 - Automotive Stampings
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 110,000
Annual Production 7,150,000 Pieces
Production Hrs. Annual 2,125
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,846 1,073,857 kWh $0.03
Electricity Demand $32,308 3,691 kW-months/year $8.75
Electricity Fees $850 - $ -
Natural Gas $35,795 7,682 MMBtu $4.66
TOTAL ENERGY COSTS $106,881
RECOMMENDED SAVINGS* $80,043 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ lb $ $ $ $
01: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$71,719
Cost:
$240,000
- - - - - - $71,719 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$71,719
-
$
-
-
$
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$6,278
Cost:
$500
- - - - - - - - $6,278 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$6,278
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,236
Cost:
$5,000
- - $1,236 134 - - - - - - -
-
kWh
$1,236
134
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$420
Cost:
-
- - - - $420 - - - - - -
-
kWh
-
-
kW-months/year
$420
-
lb
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$390
Cost:
$1,280
$156 5,275 $234 25 - - - - - - $156
5,275
kWh
$234
25
kW-months/year
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$80,043
Cost:
$246,780
$156 5,275 $1,470 159 $420 - $71,719 - $6,278 - $156
5,275
kWh
$1,470
159
kW-months/year
$420
-
lb
$71,719
-
$
$6,278
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes