Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1997
Principal Product Wood Home Decorations and Crafts
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 77,500
Annual Production 2,930 Thousand Feet
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,878 3,684,056 kWh $0.02
Electricity Demand $79,247 10,005 kW-months/year $7.92
Electricity Fees $4,400 - $ -
Natural Gas $40,475 7,754 MMBtu $5.22
TOTAL ENERGY COSTS $124,814
RECOMMENDED SAVINGS* $47,607 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,766
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ lb $ $ $ $
01: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$19,526
Cost:
$49,140
$(-891) (-35,463) $(-1,183) (-141) - - $21,600 - - - $(-891)
(-35,463)
kWh
$(-1,183)
(-141)
kW-months/year
-
-
lb
$21,600
-
$
-
-
$
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$10,577
Cost:
$500
- - - - - - - - $10,577 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$10,577
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$9,671
Cost:
-
- - - - - - - - $9,671 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$9,671
-
$
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$5,016
Cost:
$5,000
- - $5,016 600 - - - - - - -
-
kWh
$5,016
600
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,518
Cost:
-
$769 30,481 $749 90 - - - - - - $769
30,481
kWh
$749
90
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,299
Cost:
-
- - - - $1,299 - - - - - -
-
kWh
-
-
kW-months/year
$1,299
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$47,607
Cost:
$54,640
$(-122) (-4,982) $4,582 549 $1,299 - $21,600 - $20,248 - $(-122)
(-4,982)
kWh
$4,582
549
kW-months/year
$1,299
-
lb
$21,600
-
$
$20,248
-
$
TOTAL IMPLEMENTED Savings:
$21,766
Cost:
$500
$769 30,481 $749 90 - - - - $20,248 - $769
30,481
kWh
$749
90
kW-months/year
-
-
lb
-
-
$
$20,248
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes