IAC logo
IAC Assessment: WI0314
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0314
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1998
Principal Product Lithographic Commercial Printing
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 110,000
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,660 2,960,141 kWh $0.04
Electricity Demand $97,499 8,002 kW-months/year $12.18
Electricity Fees $2,424 - $ -
Natural Gas $29,891 6,384 MMBtu $4.68
TOTAL ENERGY COSTS $268,271
RECOMMENDED SAVINGS* $205,921 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,945
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$147,023
Cost:
-
- - - - - - $944 17,395 - - $146,079 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$944
17,395
lb
-
-
$
$146,079
-
$
-
-
$
02: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$30,000
Cost:
-
- - - - - - - - $30,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$30,000
-
$
-
-
$
-
-
$
03: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$15,000
Cost:
$6,350
- - - - - - - - $15,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$15,000
-
$
-
-
$
-
-
$
04: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$4,880
Cost:
$10,000
$(-22) (-586) - - - - - - - - - - $4,902 - $(-22)
(-586)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$4,902
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,605
Cost:
$4,000
$1,907 42,204 $1,698 132 - - - - - - - - - - $1,907
42,204
kWh
$1,698
132
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,567
Cost:
-
- - - - - - $2,567 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,567
-
lb
-
-
$
-
-
$
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,520
Cost:
-
$(-4) (-293) - - - - $2,274 16,752 $(-750) - - - - - $(-4)
(-293)
kWh
-
-
kW-months/year
-
-
MMBtu
$2,274
16,752
lb
$(-750)
-
$
-
-
$
-
-
$
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$820
Cost:
$1,332
- - - - $820 175 - - - - - - - - -
-
kWh
-
-
kW-months/year
$820
175
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$506
Cost:
$640
$431 9,672 $75 16 - - - - - - - - - - $431
9,672
kWh
$75
16
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$205,921
Cost:
$22,322
$2,312 50,997 $1,773 148 $820 175 $5,785 34,147 $44,250 - $146,079 - $4,902 - $2,312
50,997
kWh
$1,773
148
kW-months/year
$820
175
MMBtu
$5,785
34,147
lb
$44,250
-
$
$146,079
-
$
$4,902
-
$
TOTAL IMPLEMENTED Savings:
$35,945
Cost:
$5,332
$1,903 41,911 $1,698 132 $820 175 $2,274 16,752 $29,250 - - - - - $1,903
41,911
kWh
$1,698
132
kW-months/year
$820
175
MMBtu
$2,274
16,752
lb
$29,250
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost