IAC Assessment: WI0317
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1998
Principal Product Screws and cold headed fasteners
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 104
Plant Area (Sq.Ft.) 77,000
Annual Production 250,000,000 Pieces
Production Hrs. Annual 4,870
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,323 2,664,127 kWh $0.04
Electricity Demand $85,185 6,990 kW-months/year $12.19
Electricity Fees $4,485 - $ -
Natural Gas $16,733 4,484 MMBtu $3.73
TOTAL ENERGY COSTS $222,014
RECOMMENDED SAVINGS* $7,208 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,405
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,682
Cost:
$1,342
$778 17,878 $904 74 - - $778
17,878
kWh
$904
74
kW-months/year
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$986
Cost:
-
$456 10,551 $530 43 - - $456
10,551
kWh
$530
43
kW-months/year
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$597
Cost:
$2,250
$597 13,775 - - - - $597
13,775
kWh
-
-
kW-months/year
-
-
$
04: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$1,611
Cost:
-
- - - - $1,611 - -
-
kWh
-
-
kW-months/year
$1,611
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,138
Cost:
$740
$431 9,965 $707 58 - - $431
9,965
kWh
$707
58
kW-months/year
-
-
$
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$794
Cost:
-
- - $794 63 - - -
-
kWh
$794
63
kW-months/year
-
-
$
07: 3.7137 REPLACE CLOTH RAGS WITH PAPER TOWELS Savings:
$400
Cost:
-
- - - - $400 - -
-
kWh
-
-
kW-months/year
$400
-
$
TOTAL RECOMMENDED Savings:
$7,208
Cost:
$4,332
$2,262 52,169 $2,935 238 $2,011 - $2,262
52,169
kWh
$2,935
238
kW-months/year
$2,011
-
$
TOTAL IMPLEMENTED Savings:
$2,405
Cost:
-
- - $794 63 $1,611 - -
-
kWh
$794
63
kW-months/year
$1,611
-
$
Savings
Cost
$ kWh $ kW-months/year $ $