Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1998
Principal Product Washroom Accessories
NAICS n/a
SIC 3432 - Plumbing Fixture Fittings And Trim
Sales $10,000,000-$50,000,000
# of Employees 112
Plant Area (Sq.Ft.) 120,879
Annual Production 482,500 Pieces
Production Hrs. Annual 4,250
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,662 1,328,546 kWh $0.03
Electricity Demand $30,453 3,590 kW-months/year $8.48
Electricity Fees $720 - $ -
Natural Gas $36,609 6,578 MMBtu $5.57
TOTAL ENERGY COSTS $124,653
RECOMMENDED SAVINGS* $55,421 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$21,516
Cost:
$1,000
- - - - - - - - $21,516 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$21,516
-
$
-
-
$
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$11,052
Cost:
$500
- - - - $11,052 - - - - - - - -
-
kWh
-
-
kW-months/year
$11,052
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,348
Cost:
$1,000
- - - - $6,348 1,140 - - - - - - -
-
kWh
-
-
kW-months/year
$6,348
1,140
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,205
Cost:
$4,500
$(-262) (-7,620) - - $4,467 802 - - - - - - $(-262)
(-7,620)
kWh
-
-
kW-months/year
$4,467
802
MMBtu
-
-
lb
-
-
$
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$4,677
Cost:
$9,000
$(-23) (-586) - - - - $4,700 - - - - - $(-23)
(-586)
kWh
-
-
kW-months/year
-
-
MMBtu
$4,700
-
lb
-
-
$
-
-
$
06: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$3,817
Cost:
-
- - $6,048 675 - - - - $(-2,231) - - - -
-
kWh
$6,048
675
kW-months/year
-
-
MMBtu
-
-
lb
$(-2,231)
-
$
-
-
$
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,087
Cost:
$600
- - $1,087 108 - - - - - - - - -
-
kWh
$1,087
108
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$2,376
Cost:
-
- - - - - - - - - - $2,376 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$2,376
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$343
Cost:
$740
$171 4,982 $172 19 - - - - - - - - $171
4,982
kWh
$172
19
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$55,421
Cost:
$17,340
$(-114) (-3,224) $7,307 802 $21,867 1,942 $4,700 - $19,285 - $2,376 - $(-114)
(-3,224)
kWh
$7,307
802
kW-months/year
$21,867
1,942
MMBtu
$4,700
-
lb
$19,285
-
$
$2,376
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes