Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 1998 |
Principal Product | Cream Cheese and Butter |
NAICS | n/a |
SIC | 2020 - |
Sales | $50,000,000-$100,000,000 |
# of Employees | 95 |
Plant Area (Sq.Ft.) | 156,000 |
Annual Production | 38,000,000 Pounds |
Production Hrs. Annual | 6,144 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $166,944 | 7,354,045 | kWh | $0.02 |
Electricity Demand | $113,533 | 15,702 | kW-months/year | $7.23 |
Electricity Fees | $3,765 | - | $ | - |
Natural Gas | $245,374 | 64,076 | MMBtu | $3.83 |
TOTAL ENERGY COSTS | $561,616 | |||
RECOMMENDED SAVINGS* | $359,444 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,848 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $336,000 Cost: $240,000 |
- | - | - | - | - | - | $336,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$336,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $7,848 Cost: $500 |
- | - | - | - | $7,848 | 2,049 | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,848 2,049 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $7,598 Cost: $10,000 |
- | - | - | - | $7,598 | 1,984 | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,598 1,984 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $5,590 Cost: - |
- | - | $5,790 | 746 | - | - | $(-200) | - | - | - |
- - kWh |
$5,790 746 kW-months/year |
- - MMBtu |
$(-200) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES |
Savings: $1,652 Cost: - |
- | - | - | - | - | - | - | - | $1,652 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$1,652 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $756 Cost: $740 |
$368 | 15,240 | $388 | 50 | - | - | - | - | - | - |
$368 15,240 kWh |
$388 50 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $359,444 Cost: $251,240 |
$368 | 15,240 | $6,178 | 796 | $15,446 | 4,033 | $335,800 | - | $1,652 | - | $368 15,240 kWh |
$6,178 796 kW-months/year |
$15,446 4,033 MMBtu |
$335,800 - $ |
$1,652 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,848 Cost: $500 |
- | - | - | - | $7,848 | 2,049 | - | - | - | - | - - kWh |
- - kW-months/year |
$7,848 2,049 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material |