IAC Assessment: WI0325
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0325
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1998
Principal Product Cream Cheese and Butter
NAICS n/a
SIC 2020 -
Sales $50,000,000-$100,000,000
# of Employees 95
Plant Area (Sq.Ft.) 156,000
Annual Production 38,000,000 Pounds
Production Hrs. Annual 6,144
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $166,944 7,354,045 kWh $0.02
Electricity Demand $113,533 15,702 kW-months/year $7.23
Electricity Fees $3,765 - $ -
Natural Gas $245,374 64,076 MMBtu $3.83
TOTAL ENERGY COSTS $561,616
RECOMMENDED SAVINGS* $359,444 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,848
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$336,000
Cost:
$240,000
- - - - - - $336,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$336,000
-
$
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$7,848
Cost:
$500
- - - - $7,848 2,049 - - - - -
-
kWh
-
-
kW-months/year
$7,848
2,049
MMBtu
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,598
Cost:
$10,000
- - - - $7,598 1,984 - - - - -
-
kWh
-
-
kW-months/year
$7,598
1,984
MMBtu
-
-
$
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,590
Cost:
-
- - $5,790 746 - - $(-200) - - - -
-
kWh
$5,790
746
kW-months/year
-
-
MMBtu
$(-200)
-
$
-
-
$
05: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$1,652
Cost:
-
- - - - - - - - $1,652 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,652
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$756
Cost:
$740
$368 15,240 $388 50 - - - - - - $368
15,240
kWh
$388
50
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$359,444
Cost:
$251,240
$368 15,240 $6,178 796 $15,446 4,033 $335,800 - $1,652 - $368
15,240
kWh
$6,178
796
kW-months/year
$15,446
4,033
MMBtu
$335,800
-
$
$1,652
-
$
TOTAL IMPLEMENTED Savings:
$7,848
Cost:
$500
- - - - $7,848 2,049 - - - - -
-
kWh
-
-
kW-months/year
$7,848
2,049
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material