Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 1998 |
Principal Product | Printed Circuit Boards |
NAICS | n/a |
SIC | 3672 - Printed Circuit Boards |
Sales | $10,000,000-$50,000,000 |
# of Employees | 210 |
Plant Area (Sq.Ft.) | 57,000 |
Annual Production | 1,300,000 Pieces |
Production Hrs. Annual | 6,300 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $223,243 | 5,145,956 | kWh | $0.04 |
Electricity Demand | $127,298 | 10,416 | kW-months/year | $12.22 |
Electricity Fees | $1,321 | - | $ | - |
Natural Gas | $12,756 | 2,939 | MMBtu | $4.34 |
TOTAL ENERGY COSTS | $(-354,793) | |||
RECOMMENDED SAVINGS* | $126,547 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $52,640 Cost: $25,000 |
$(-995) | (-11,430) | - | - | - | - | $54,135 | 15,600,938 | - | - | - | - | $(-500) | - |
$(-995) (-11,430) kWh |
- - kW-months/year |
- - MMBtu |
$54,135 15,600,938 Tgal |
- - lb |
- - $ |
$(-500) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.3132 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL |
Savings: $43,913 Cost: $40,000 |
- | - | - | - | - | - | $45,113 | 13,000,718 | - | - | - | - | $(-1,200) | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$45,113 13,000,718 Tgal |
- - lb |
- - $ |
$(-1,200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $11,269 Cost: $20,000 |
- | - | $11,269 | 837 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$11,269 837 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7251 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF |
Savings: $7,874 Cost: $12,186 |
$4,390 | 91,735 | $3,866 | 287 | - | - | $(-382) | (-110,160) | - | - | - | - | - | - |
$4,390 91,735 kWh |
$3,866 287 kW-months/year |
- - MMBtu |
$(-382) (-110,160) Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.7131 USE A RAG RECYCLE SERVICE |
Savings: $4,430 Cost: - |
- | - | - | - | - | - | - | - | $680 | 28,950 | $3,750 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$680 28,950 lb |
$3,750 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,348 Cost: $12,500 |
$3,348 | 70,047 | - | - | - | - | - | - | - | - | - | - | - | - |
$3,348 70,047 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,948 Cost: $740 |
$1,341 | 28,136 | $607 | 45 | - | - | - | - | - | - | - | - | - | - |
$1,341 28,136 kWh |
$607 45 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $504 Cost: $400 |
- | - | - | - | $504 | 116 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$504 116 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $321 Cost: $46 |
$200 | 4,103 | $121 | 9 | - | - | - | - | - | - | - | - | - | - |
$200 4,103 kWh |
$121 9 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.6113 REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS |
Savings: $300 Cost: - |
- | - | - | - | - | - | - | - | $300 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$300 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $126,547 Cost: $110,872 |
$8,284 | 182,591 | $15,863 | 1,178 | $504 | 116 | $98,866 | 28,491,496 | $980 | 28,950 | $3,750 | - | $(-1,700) | - | $8,284 182,591 kWh |
$15,863 1,178 kW-months/year |
$504 116 MMBtu |
$98,866 28,491,496 Tgal |
$980 28,950 lb |
$3,750 - $ |
$(-1,700) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost |