IAC Assessment: WI0329
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0329
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1998
Principal Product Slurry Pumps
NAICS n/a
SIC 3561 - Pumps And Pumping Equipment
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 77,000
Annual Production 1,440 Pieces
Production Hrs. Annual 6,480
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,468 2,787,222 kWh $0.03
Electricity Demand $78,305 11,043 kW-months/year $7.09
Electricity Fees $10,036 - $ -
Natural Gas $33,748 7,012 MMBtu $4.81
TOTAL ENERGY COSTS $229,663
RECOMMENDED SAVINGS* $56,238 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,962
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $
01: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$22,908
Cost:
$1,500
- - - - - - - - - - - - - - $22,908 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
$22,908
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$14,336
Cost:
-
- - $14,808 1,977 - - - - - - $(-472) - - - - - -
-
kWh
$14,808
1,977
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$(-472)
-
$
-
-
$
-
-
$
03: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,092
Cost:
$400
- - $1,092 146 - - - - - - - - - - - - -
-
kWh
$1,092
146
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$10,231
Cost:
$11,400
- - - - - - $12,472 - $(-542) (-366) $(-1,119) - - - $(-580) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,472
-
gal
$(-542)
(-366)
lb
$(-1,119)
-
$
-
-
$
$(-580)
-
$
05: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$3,600
Cost:
$9,500
- - - - - - - - - - - - $3,600 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$3,600
-
$
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,445
Cost:
$1,600
- - - - $3,445 716 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,445
716
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$626
Cost:
$640
$470 14,947 $156 21 - - - - - - - - - - - - $470
14,947
kWh
$156
21
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$56,238
Cost:
$25,040
$470 14,947 $16,056 2,144 $3,445 716 $12,472 - $(-542) (-366) $(-1,591) - $3,600 - $22,328 - $470
14,947
kWh
$16,056
2,144
kW-months/year
$3,445
716
MMBtu
$12,472
-
gal
$(-542)
(-366)
lb
$(-1,591)
-
$
$3,600
-
$
$22,328
-
$
TOTAL IMPLEMENTED Savings:
$38,962
Cost:
$2,540
$470 14,947 $16,056 2,144 - - - - - - $(-472) - - - $22,908 - $470
14,947
kWh
$16,056
2,144
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$(-472)
-
$
-
-
$
$22,908
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material