IAC Assessment: WI0331
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0331
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1998
Principal Product Lead Castings
NAICS n/a
SIC 3053 - Gaskets, Packing And Sealing Devices
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 50,000
Annual Production 1,200,000 Pounds
Production Hrs. Annual 4,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,311 804,807 kWh $0.03
Electricity Demand $29,636 3,489 kW-months/year $8.49
Electricity Fees $3,759 - $ -
Natural Gas $56,153 13,002 MMBtu $4.32
TOTAL ENERGY COSTS $138,439
RECOMMENDED SAVINGS* $69,243 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,129
#|Description Savings
Cost
Status Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Administrative Changes Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Administrative Changes
$ kW-months/year $ MMBtu $ lb $ $ $ $
01: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$45,000
Cost:
-
- - - - - - $45,000 - - - -
-
kW-months/year
-
-
MMBtu
-
-
lb
$45,000
-
$
-
-
$
02: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$6,295
Cost:
$11,500
- - $6,295 1,457 - - - - - - -
-
kW-months/year
$6,295
1,457
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$6,880
Cost:
$500
- - - - - - - - $6,880 - -
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$6,880
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,975
Cost:
$8,500
- - - - $3,975 - - - - - -
-
kW-months/year
-
-
MMBtu
$3,975
-
lb
-
-
$
-
-
$
05: 3.7137 REPLACE CLOTH RAGS WITH PAPER TOWELS Savings:
$1,218
Cost:
-
- - - - - - - - $1,218 - -
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$1,218
-
$
06: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$3,729
Cost:
-
$3,729 416 - - - - - - - - $3,729
416
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,249
Cost:
$300
$1,249 108 - - - - - - - - $1,249
108
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$897
Cost:
$608
- - $897 208 - - - - - - -
-
kW-months/year
$897
208
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$69,243
Cost:
$21,408
$4,978 524 $7,192 1,665 $3,975 - $45,000 - $8,098 - $4,978
524
kW-months/year
$7,192
1,665
MMBtu
$3,975
-
lb
$45,000
-
$
$8,098
-
$
TOTAL IMPLEMENTED Savings:
$53,129
Cost:
$800
$1,249 108 - - - - $45,000 - $6,880 - $1,249
108
kW-months/year
-
-
MMBtu
-
-
lb
$45,000
-
$
$6,880
-
$
Savings
Cost
$ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Administrative Changes Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Administrative Changes