IAC logo
IAC Assessment: WI0338
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0338
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1999
Principal Product Precision Molded Components
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 67
Plant Area (Sq.Ft.) 60,100
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,742 2,219,519 kWh $0.04
Electricity Demand $61,975 5,055 kW-months/year $12.26
Electricity Fees $9,123 - $ -
Natural Gas $6,718 1,301 MMBtu $5.16
TOTAL ENERGY COSTS $172,917
RECOMMENDED SAVINGS* $40,427 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$15,106
Cost:
-
$15,106 364,009 - - - - - - $15,106
364,009
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,524
Cost:
$20,900
$11,524 277,843 - - - - - - $11,524
277,843
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
03: 2.7251 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF Savings:
$4,369
Cost:
$7,590
$2,374 57,151 $2,303 179 $(-308) (-68,400) - - $2,374
57,151
kWh
$2,303
179
kW-months/year
$(-308)
(-68,400)
Tgal
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,410
Cost:
$7,200
$1,283 30,774 $1,127 87 - - - - $1,283
30,774
kWh
$1,127
87
kW-months/year
-
-
Tgal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,072
Cost:
$210
$1,414 33,998 $658 51 - - - - $1,414
33,998
kWh
$658
51
kW-months/year
-
-
Tgal
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$434
Cost:
$640
$286 7,034 $148 11 - - - - $286
7,034
kWh
$148
11
kW-months/year
-
-
Tgal
-
-
$
07: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$1,906
Cost:
$6,000
$1,210 29,015 $696 54 - - - - $1,210
29,015
kWh
$696
54
kW-months/year
-
-
Tgal
-
-
$
08: 3.7137 REPLACE CLOTH RAGS WITH PAPER TOWELS Savings:
$1,671
Cost:
-
- - - - - - $1,671 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$1,671
-
$
09: 4.232 LEASE EQUIPMENT INSTEAD OF PURCHASING Savings:
$828
Cost:
-
- - - - - - $828 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$828
-
$
10: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$107
Cost:
-
- - - - - - $107 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$107
-
$
TOTAL RECOMMENDED Savings:
$40,427
Cost:
$42,540
$33,197 799,824 $4,932 382 $(-308) (-68,400) $2,606 - $33,197
799,824
kWh
$4,932
382
kW-months/year
$(-308)
(-68,400)
Tgal
$2,606
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes