Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1999
Principal Product Custom Metal Stampings
NAICS n/a
SIC 3460 -
Sales $10,000,000-$50,000,000
# of Employees 63
Plant Area (Sq.Ft.) 90,000
Annual Production 11,500,000 Pounds
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,620 1,390,680 kWh $0.03
Electricity Demand $35,559 4,051 kW-months/year $8.78
Electricity Fees $5,043 - $ -
Natural Gas $9,100 1,654 MMBtu $5.50
TOTAL ENERGY COSTS $106,793
RECOMMENDED SAVINGS* $47,831 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,128
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$32,000
Cost:
$2,800
- - - - - - - - - - $32,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$32,000
-
$
-
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,862
Cost:
$11,000
$(-453) (-14,068) - - $4,315 785 - - - - - - - - $(-453)
(-14,068)
kWh
-
-
kW-months/year
$4,315
785
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
03: 3.4155 METER WASTE WATER Savings:
$3,128
Cost:
$1,000
- - - - - - $3,128 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,128
-
Tgal
-
-
lb
-
-
$
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,086
Cost:
$2,445
$1,919 59,203 $1,167 126 - - - - - - - - - - $1,919
59,203
kWh
$1,167
126
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
05: 3.7137 REPLACE CLOTH RAGS WITH PAPER TOWELS Savings:
$2,243
Cost:
-
- - - - - - - - $(-222) (-6,860) - - $2,465 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-222)
(-6,860)
lb
-
-
$
$2,465
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,777
Cost:
$1,280
$1,263 38,980 $514 55 - - - - - - - - - - $1,263
38,980
kWh
$514
55
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
07: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$917
Cost:
-
- - $917 99 - - - - - - - - - - -
-
kWh
$917
99
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
08: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$260
Cost:
$100
- - $260 26 - - - - - - - - - - -
-
kWh
$260
26
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$558
Cost:
$600
- - - - $558 102 - - - - - - - - -
-
kWh
-
-
kW-months/year
$558
102
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$47,831
Cost:
$19,225
$2,729 84,115 $2,858 306 $4,873 887 $3,128 - $(-222) (-6,860) $32,000 - $2,465 - $2,729
84,115
kWh
$2,858
306
kW-months/year
$4,873
887
MMBtu
$3,128
-
Tgal
$(-222)
(-6,860)
lb
$32,000
-
$
$2,465
-
$
TOTAL IMPLEMENTED Savings:
$35,128
Cost:
$3,800
- - - - - - $3,128 - - - $32,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,128
-
Tgal
-
-
lb
$32,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes