IAC logo
IAC Assessment: WI0349
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0349
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1999
Principal Product Knitwear
NAICS n/a
SIC 2253 - Knit Outerwear Mills
Sales $5,000,000-$10,000,000
# of Employees 105
Plant Area (Sq.Ft.) 163,050
Annual Production 2,236,000 Pieces
Production Hrs. Annual 4,250
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,905 613,130 kWh $0.04
Electricity Demand $23,670 2,763 kW-months/year $8.57
Electricity Fees $4,700 - $ -
Natural Gas $35,195 7,147 MMBtu $4.92
TOTAL ENERGY COSTS $102,362
RECOMMENDED SAVINGS* $24,051 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,360
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$7,513
Cost:
$500
- - - - $7,513 - - - - - - - -
-
kWh
-
-
kW-months/year
$7,513
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,254
Cost:
$25,528
$3,586 87,046 $1,668 184 - - - - - - - - $3,586
87,046
kWh
$1,668
184
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,784
Cost:
$800
- - - - $2,784 566 - - - - - - -
-
kWh
-
-
kW-months/year
$2,784
566
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,309
Cost:
$306
- - - - $2,309 469 - - - - - - -
-
kWh
-
-
kW-months/year
$2,309
469
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,927
Cost:
$500
- - - - $1,927 392 - - - - - - -
-
kWh
-
-
kW-months/year
$1,927
392
MMBtu
-
-
Tgal
-
-
lb
-
-
$
06: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,918
Cost:
-
- - - - - - - - - - $1,918 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$1,918
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,649
Cost:
-
- - - - - - - - $1,649 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,649
-
lb
-
-
$
08: 2.8112 COMBINE UTILITY METERS Savings:
$356
Cost:
$200
- - - - - - $356 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$356
-
Tgal
-
-
lb
-
-
$
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$341
Cost:
$682
- - - - $341 69 - - - - - - -
-
kWh
-
-
kW-months/year
$341
69
MMBtu
-
-
Tgal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$24,051
Cost:
$28,516
$3,586 87,046 $1,668 184 $14,874 1,496 $356 - $1,649 - $1,918 - $3,586
87,046
kWh
$1,668
184
kW-months/year
$14,874
1,496
MMBtu
$356
-
Tgal
$1,649
-
lb
$1,918
-
$
TOTAL IMPLEMENTED Savings:
$6,360
Cost:
$1,300
- - - - $4,711 958 - - $1,649 - - - -
-
kWh
-
-
kW-months/year
$4,711
958
MMBtu
-
-
Tgal
$1,649
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes