IAC logo
IAC Assessment: WI0355
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0355
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1999
Principal Product Commercial Printed Products
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 40,000
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,933 1,465,416 kWh $0.04
Electricity Demand $69,776 5,628 kW-months/year $12.40
Electricity Fees $16,693 - $ -
Natural Gas $15,685 3,415 MMBtu $4.59
TOTAL ENERGY COSTS $171,891
RECOMMENDED SAVINGS* $10,770 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,454
Cost:
$1,484
$2,092 53,634 $1,362 104 - - - - $2,092
53,634
kWh
$1,362
104
kW-months/year
-
-
lb
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,359
Cost:
$7,200
$2,359 60,668 - - - - - - $2,359
60,668
kWh
-
-
kW-months/year
-
-
lb
-
-
$
03: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$1,875
Cost:
$6,350
- - - - - - $1,875 - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,875
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,752
Cost:
-
- - - - $1,752 - - - -
-
kWh
-
-
kW-months/year
$1,752
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$689
Cost:
$1,807
$304 7,913 $385 29 - - - - $304
7,913
kWh
$385
29
kW-months/year
-
-
lb
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$641
Cost:
$640
$384 9,965 $257 20 - - - - $384
9,965
kWh
$257
20
kW-months/year
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$10,770
Cost:
$17,481
$5,139 132,180 $2,004 153 $1,752 - $1,875 - $5,139
132,180
kWh
$2,004
153
kW-months/year
$1,752
-
lb
$1,875
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes