IAC Assessment: WI0356
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0356
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1999
Principal Product Die Cast Parts
NAICS n/a
SIC 3325 - Steel Foundries, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 160,000
Annual Production 4,500,000 Pounds
Production Hrs. Annual 6,600
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $181,011 4,327,081 kWh $0.04
Electricity Demand $126,951 10,434 kW-months/year $12.17
Electricity Fees $(-16,408) - $ -
Natural Gas $176,964 69,191 MMBtu $2.56
TOTAL ENERGY COSTS $486,954
RECOMMENDED SAVINGS* $112,383 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,718
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$77,392
Cost:
$162,000
$89,681 1,945,487 $63,242 4,716 $(-75,531) (-29,504) - - - - - - $89,681
1,945,487
kWh
$63,242
4,716
kW-months/year
$(-75,531)
(-29,504)
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,279
Cost:
$58,100
$17,279 374,853 - - - - - - - - - - $17,279
374,853
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,328
Cost:
$3,182
$4,965 107,562 $2,363 176 - - - - - - - - $4,965
107,562
kWh
$2,363
176
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,610
Cost:
$3,150
$(-226) (-4,982) - - $2,836 1,108 - - - - - - $(-226)
(-4,982)
kWh
-
-
kW-months/year
$2,836
1,108
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$223
Cost:
$666
- - - - $223 87 - - - - - - -
-
kWh
-
-
kW-months/year
$223
87
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,408
Cost:
$640
$1,520 33,118 $888 66 - - - - - - - - $1,520
33,118
kWh
$888
66
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,364
Cost:
-
- - - - - - $2,364 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,364
-
lb
-
-
$
-
-
$
08: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$1,469
Cost:
$500
- - - - - - - - - - $1,469 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$1,469
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,205
Cost:
$3,856
$565 12,309 $640 48 - - - - - - - - $565
12,309
kWh
$640
48
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
10: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$105
Cost:
-
- - - - - - - - $105 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$105
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$112,383
Cost:
$232,094
$113,784 2,468,347 $67,133 5,006 $(-72,472) (-28,309) $2,364 - $105 - $1,469 - $113,784
2,468,347
kWh
$67,133
5,006
kW-months/year
$(-72,472)
(-28,309)
MMBtu
$2,364
-
lb
$105
-
$
$1,469
-
$
TOTAL IMPLEMENTED Savings:
$3,718
Cost:
$4,496
$2,085 45,427 $1,528 114 - - - - $105 - - - $2,085
45,427
kWh
$1,528
114
kW-months/year
-
-
MMBtu
-
-
lb
$105
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost