Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 1999 |
Principal Product | Die Cast Parts |
NAICS | n/a |
SIC | 3325 - Steel Foundries, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 160,000 |
Annual Production | 4,500,000 Pounds |
Production Hrs. Annual | 6,600 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $181,011 | 4,327,081 | kWh | $0.04 |
Electricity Demand | $126,951 | 10,434 | kW-months/year | $12.17 |
Electricity Fees | $(-16,408) | - | $ | - |
Natural Gas | $176,964 | 69,191 | MMBtu | $2.56 |
TOTAL ENERGY COSTS | $486,954 | |||
RECOMMENDED SAVINGS* | $112,383 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,718 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $77,392 Cost: $162,000 |
$89,681 | 1,945,487 | $63,242 | 4,716 | $(-75,531) | (-29,504) | - | - | - | - | - | - |
$89,681 1,945,487 kWh |
$63,242 4,716 kW-months/year |
$(-75,531) (-29,504) MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $17,279 Cost: $58,100 |
$17,279 | 374,853 | - | - | - | - | - | - | - | - | - | - |
$17,279 374,853 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $7,328 Cost: $3,182 |
$4,965 | 107,562 | $2,363 | 176 | - | - | - | - | - | - | - | - |
$4,965 107,562 kWh |
$2,363 176 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $2,610 Cost: $3,150 |
$(-226) | (-4,982) | - | - | $2,836 | 1,108 | - | - | - | - | - | - |
$(-226) (-4,982) kWh |
- - kW-months/year |
$2,836 1,108 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $223 Cost: $666 |
- | - | - | - | $223 | 87 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$223 87 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,408 Cost: $640 |
$1,520 | 33,118 | $888 | 66 | - | - | - | - | - | - | - | - |
$1,520 33,118 kWh |
$888 66 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $2,364 Cost: - |
- | - | - | - | - | - | $2,364 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,364 - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $1,469 Cost: $500 |
- | - | - | - | - | - | - | - | - | - | $1,469 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$1,469 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,205 Cost: $3,856 |
$565 | 12,309 | $640 | 48 | - | - | - | - | - | - | - | - |
$565 12,309 kWh |
$640 48 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $105 Cost: - |
- | - | - | - | - | - | - | - | $105 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$105 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $112,383 Cost: $232,094 |
$113,784 | 2,468,347 | $67,133 | 5,006 | $(-72,472) | (-28,309) | $2,364 | - | $105 | - | $1,469 | - | $113,784 2,468,347 kWh |
$67,133 5,006 kW-months/year |
$(-72,472) (-28,309) MMBtu |
$2,364 - lb |
$105 - $ |
$1,469 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,718 Cost: $4,496 |
$2,085 | 45,427 | $1,528 | 114 | - | - | - | - | $105 | - | - | - | $2,085 45,427 kWh |
$1,528 114 kW-months/year |
- - MMBtu |
- - lb |
$105 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost |