IAC Assessment: WI0362
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0362
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2000
Principal Product Hydraulic, Water, and Air Hoses
NAICS n/a
SIC 3492 - Fluid Power Valves & Hose Fittings
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 140,000
Annual Production 30,000,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $214,625 7,027,550 kWh $0.03
Electricity Demand $106,689 16,546 kW-months/year $6.45
Electricity Fees $28,950 - $ -
Natural Gas $44,597 13,327 MMBtu $3.35
TOTAL ENERGY COSTS $483,655
RECOMMENDED SAVINGS* $24,436 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,598
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,236
Cost:
$1,860
$4,737 147,714 $1,499 221 - - - - - - - - $4,737
147,714
kWh
$1,499
221
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,550
Cost:
$740
$1,123 34,877 $427 63 - - - - - - - - $1,123
34,877
kWh
$427
63
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,619
Cost:
$16,000
$3,387 105,510 $2,232 330 - - - - - - - - $3,387
105,510
kWh
$2,232
330
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
04: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$3,741
Cost:
$14,500
$(-384) (-12,016) $(-163) (-24) $4,788 5,832,000 - - $(-500) - - - $(-384)
(-12,016)
kWh
$(-163)
(-24)
kW-months/year
$4,788
5,832,000
Tgal
-
-
lb
$(-500)
-
$
-
-
$
05: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$3,598
Cost:
$6,375
- - - - $5,098 6,210,000 - - - - $(-1,500) - -
-
kWh
-
-
kW-months/year
$5,098
6,210,000
Tgal
-
-
lb
-
-
$
$(-1,500)
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,130
Cost:
$2,150
$1,414 43,962 $716 106 - - - - - - - - $1,414
43,962
kWh
$716
106
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
07: 3.5218 REUSE / RECYCLE/ SELL RUBBER PRODUCTS Savings:
$1,562
Cost:
-
- - - - - - $1,562 83,200 - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$1,562
83,200
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$24,436
Cost:
$41,625
$10,277 320,047 $4,711 696 $9,886 12,042,000 $1,562 83,200 $(-500) - $(-1,500) - $10,277
320,047
kWh
$4,711
696
kW-months/year
$9,886
12,042,000
Tgal
$1,562
83,200
lb
$(-500)
-
$
$(-1,500)
-
$
TOTAL IMPLEMENTED Savings:
$3,598
Cost:
$6,375
- - - - $5,098 6,210,000 - - - - $(-1,500) - -
-
kWh
-
-
kW-months/year
$5,098
6,210,000
Tgal
-
-
lb
-
-
$
$(-1,500)
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost