IAC Assessment: WI0364
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0364
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2000
Principal Product Heat Treating, Metal Finishing, Specialty Coatings
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 105,750
Annual Production 82,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $227,958 6,756,741 kWh $0.03
Electricity Demand $175,133 12,472 kW-months/year $14.04
Electricity Fees $29,715 - $ -
Natural Gas $426,871 161,146 MMBtu $2.65
TOTAL ENERGY COSTS $1,057,851
RECOMMENDED SAVINGS* $39,074 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,162
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$20,162
Cost:
-
- - - - - - $20,162 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$20,162
-
lb
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$7,614
Cost:
$15,000
- - $7,614 389 - - - - -
-
kWh
$7,614
389
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$6,918
Cost:
$20,750
$4,624 130,715 $2,294 156 - - - - $4,624
130,715
kWh
$2,294
156
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,730
Cost:
$740
$1,235 34,877 $495 34 - - - - $1,235
34,877
kWh
$495
34
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$489
Cost:
$90
$339 9,672 $150 10 - - - - $339
9,672
kWh
$150
10
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,567
Cost:
$3,871
- - - - $1,567 592 - - -
-
kWh
-
-
kW-months/year
$1,567
592
MMBtu
-
-
lb
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$594
Cost:
$438
$346 9,672 $248 17 - - - - $346
9,672
kWh
$248
17
kW-months/year
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$39,074
Cost:
$40,889
$6,544 184,936 $10,801 606 $1,567 592 $20,162 - $6,544
184,936
kWh
$10,801
606
kW-months/year
$1,567
592
MMBtu
$20,162
-
lb
TOTAL IMPLEMENTED Savings:
$20,162
Cost:
-
- - - - - - $20,162 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$20,162
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)