IAC Assessment: WI0367
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2000
Principal Product Duplicator Presses
NAICS n/a
SIC 3861 - Photographic Equipment And Supplies
Sales $10,000,000-$50,000,000
# of Employees 111
Plant Area (Sq.Ft.) 107,000
Annual Production 650 Pieces
Production Hrs. Annual 4,250
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,083 2,087,925 kWh $0.03
Electricity Demand $78,561 6,311 kW-months/year $12.45
Electricity Fees $12,919 - $ -
Natural Gas $50,662 13,636 MMBtu $3.72
TOTAL ENERGY COSTS $247,985
RECOMMENDED SAVINGS* $106,927 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$57,375
Cost:
-
- - - - - - - - $57,375 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$57,375
-
$
-
-
$
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$14,201
Cost:
-
- - - - - - $14,201 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,201
-
lb
-
-
$
-
-
$
03: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$12,036
Cost:
$9,000
- - - - - - $12,374 87,600 $(-338) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,374
87,600
lb
$(-338)
-
$
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,036
Cost:
$800
- - - - $7,036 1,892 - - - - - - -
-
kWh
-
-
kW-months/year
$7,036
1,892
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$4,226
Cost:
-
- - - - $4,226 1,136 - - - - - - -
-
kWh
-
-
kW-months/year
$4,226
1,136
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$3,882
Cost:
$5,500
$(-313) (-8,792) - - $4,195 1,128 - - - - - - $(-313)
(-8,792)
kWh
-
-
kW-months/year
$4,195
1,128
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$4,657
Cost:
-
- - $4,657 574 - - - - - - - - -
-
kWh
$4,657
574
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$2,436
Cost:
-
- - - - - - - - - - $2,436 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$2,436
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$928
Cost:
$1,092
$256 7,034 $672 50 - - - - - - - - $256
7,034
kWh
$672
50
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$150
Cost:
$640
$39 1,172 $111 8 - - - - - - - - $39
1,172
kWh
$111
8
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$106,927
Cost:
$17,032
$(-18) (-586) $5,440 632 $15,457 4,156 $26,575 87,600 $57,037 - $2,436 - $(-18)
(-586)
kWh
$5,440
632
kW-months/year
$15,457
4,156
MMBtu
$26,575
87,600
lb
$57,037
-
$
$2,436
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes