IAC Assessment: WI0369
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0369
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2000
Principal Product Audio and Video Mounting Systems
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 107,000
Annual Production 800,000 Pieces
Production Hrs. Annual 4,250
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,470 1,609,613 kWh $0.04
Electricity Demand $40,685 3,329 kW-months/year $12.22
Electricity Fees $11,495 - $ -
Natural Gas $72,300 23,113 MMBtu $3.13
TOTAL ENERGY COSTS $188,348
RECOMMENDED SAVINGS* $15,730 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,275
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
01: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$4,974
Cost:
$12,000
- - - - $(-438) (-140) $5,796 13,248 - - $(-384) - - - -
-
kWh
-
-
kW-months/year
$(-438)
(-140)
MMBtu
$5,796
13,248
gal
-
-
lb
$(-384)
-
$
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,760
Cost:
$1,200
- - - - $3,760 1,201 - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,760
1,201
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$2,942
Cost:
$6,524
- - - - - - $3,892 436 $(-260) (-138) $(-407) - $(-283) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,892
436
gal
$(-260)
(-138)
lb
$(-407)
-
$
$(-283)
-
$
04: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$1,445
Cost:
$1,858
- - - - $1,445 462 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,445
462
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$392
Cost:
$1,103
- - - - $392 125 - - - - - - - - -
-
kWh
-
-
kW-months/year
$392
125
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,146
Cost:
$5,097
- - $664 52 $482 42 - - - - - - - - -
-
kWh
$664
52
kW-months/year
$482
42
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$515
Cost:
-
$236 5,862 $279 22 - - - - - - - - - - $236
5,862
kWh
$279
22
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$556
Cost:
$640
$336 8,499 $220 17 - - - - - - - - - - $336
8,499
kWh
$220
17
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$15,730
Cost:
$28,422
$572 14,361 $1,163 91 $5,641 1,690 $9,688 13,684 $(-260) (-138) $(-791) - $(-283) - $572
14,361
kWh
$1,163
91
kW-months/year
$5,641
1,690
MMBtu
$9,688
13,684
gal
$(-260)
(-138)
lb
$(-791)
-
$
$(-283)
-
$
TOTAL IMPLEMENTED Savings:
$4,275
Cost:
$1,200
$236 5,862 $279 22 $3,760 1,201 - - - - - - - - $236
5,862
kWh
$279
22
kW-months/year
$3,760
1,201
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material