Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2000 |
Principal Product | Audio and Video Mounting Systems |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 107,000 |
Annual Production | 800,000 Pieces |
Production Hrs. Annual | 4,250 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $60,470 | 1,609,613 | kWh | $0.04 |
Electricity Demand | $40,685 | 3,329 | kW-months/year | $12.22 |
Electricity Fees | $11,495 | - | $ | - |
Natural Gas | $72,300 | 23,113 | MMBtu | $3.13 |
TOTAL ENERGY COSTS | $188,348 | |||
RECOMMENDED SAVINGS* | $15,730 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,275 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $4,974 Cost: $12,000 |
- | - | - | - | $(-438) | (-140) | $5,796 | 13,248 | - | - | $(-384) | - | - | - |
- - kWh |
- - kW-months/year |
$(-438) (-140) MMBtu |
$5,796 13,248 gal |
- - lb |
$(-384) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $3,760 Cost: $1,200 |
- | - | - | - | $3,760 | 1,201 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,760 1,201 MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE |
Savings: $2,942 Cost: $6,524 |
- | - | - | - | - | - | $3,892 | 436 | $(-260) | (-138) | $(-407) | - | $(-283) | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,892 436 gal |
$(-260) (-138) lb |
$(-407) - $ |
$(-283) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $1,445 Cost: $1,858 |
- | - | - | - | $1,445 | 462 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,445 462 MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $392 Cost: $1,103 |
- | - | - | - | $392 | 125 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$392 125 MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,146 Cost: $5,097 |
- | - | $664 | 52 | $482 | 42 | - | - | - | - | - | - | - | - |
- - kWh |
$664 52 kW-months/year |
$482 42 MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $515 Cost: - |
$236 | 5,862 | $279 | 22 | - | - | - | - | - | - | - | - | - | - |
$236 5,862 kWh |
$279 22 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $556 Cost: $640 |
$336 | 8,499 | $220 | 17 | - | - | - | - | - | - | - | - | - | - |
$336 8,499 kWh |
$220 17 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $15,730 Cost: $28,422 |
$572 | 14,361 | $1,163 | 91 | $5,641 | 1,690 | $9,688 | 13,684 | $(-260) | (-138) | $(-791) | - | $(-283) | - | $572 14,361 kWh |
$1,163 91 kW-months/year |
$5,641 1,690 MMBtu |
$9,688 13,684 gal |
$(-260) (-138) lb |
$(-791) - $ |
$(-283) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,275 Cost: $1,200 |
$236 | 5,862 | $279 | 22 | $3,760 | 1,201 | - | - | - | - | - | - | - | - | $236 5,862 kWh |
$279 22 kW-months/year |
$3,760 1,201 MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material |