Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2001 |
Principal Product | Pressure Sensitive Labels and Plastic Films |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 97 |
Plant Area (Sq.Ft.) | 110,184 |
Annual Production | 14,400 Thousand Feet |
Production Hrs. Annual | 8,400 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $75,195 | 1,994,431 | kWh | $0.04 |
Electricity Demand | $58,440 | 4,795 | kW-months/year | $12.19 |
Electricity Fees | $9,191 | - | $ | - |
Natural Gas | $64,785 | 12,051 | MMBtu | $5.38 |
TOTAL ENERGY COSTS | $295,333 | |||
RECOMMENDED SAVINGS* | $57,868 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE |
Savings: $27,904 Cost: $20,000 |
- | - | - | - | - | - | $12,600 | 6,930 | $(-1,224) | (-3,216) | $(-2,530) | - | $19,058 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$12,600 6,930 gal |
$(-1,224) (-3,216) lb |
$(-2,530) - $ |
$19,058 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $11,368 Cost: - |
- | - | - | - | - | - | - | - | $11,368 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$11,368 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,197 Cost: $12,760 |
$3,046 | 77,374 | $1,151 | 91 | - | - | - | - | - | - | - | - | - | - |
$3,046 77,374 kWh |
$1,151 91 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $3,301 Cost: $2,460 |
- | - | - | - | $3,301 | 614 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,301 614 MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $3,200 Cost: $9,600 |
$2,377 | 60,375 | $823 | 65 | - | - | - | - | - | - | - | - | - | - |
$2,377 60,375 kWh |
$823 65 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,502 Cost: $1,000 |
- | - | - | - | $2,502 | 465 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,502 465 MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,586 Cost: $1,280 |
$1,142 | 29,015 | $444 | 35 | - | - | - | - | - | - | - | - | - | - |
$1,142 29,015 kWh |
$444 35 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $478 Cost: $90 |
$355 | 9,086 | $123 | 10 | - | - | - | - | - | - | - | - | - | - |
$355 9,086 kWh |
$123 10 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $1,641 Cost: $3,750 |
$(-462) | (-12,016) | - | - | $2,103 | 391 | - | - | - | - | - | - | - | - |
$(-462) (-12,016) kWh |
- - kW-months/year |
$2,103 391 MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,158 Cost: $627 |
$774 | 19,637 | $384 | 30 | - | - | - | - | - | - | - | - | - | - |
$774 19,637 kWh |
$384 30 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $533 Cost: - |
$319 | 8,206 | $214 | 17 | - | - | - | - | - | - | - | - | - | - |
$319 8,206 kWh |
$214 17 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $57,868 Cost: $51,567 |
$7,551 | 191,677 | $3,139 | 248 | $7,906 | 1,470 | $12,600 | 6,930 | $10,144 | (-3,216) | $(-2,530) | - | $19,058 | - | $7,551 191,677 kWh |
$3,139 248 kW-months/year |
$7,906 1,470 MMBtu |
$12,600 6,930 gal |
$10,144 (-3,216) lb |
$(-2,530) - $ |
$19,058 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material |