IAC logo
IAC Assessment: WI0390
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0390
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2001
Principal Product X-Ray Diffraction Systems
NAICS n/a
SIC 3844 - X-ray Apparatus And Tubes
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 45,600
Annual Production 135 Pieces
Production Hrs. Annual 2,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,279 1,206,917 kWh $0.03
Electricity Demand $21,650 2,632 kW-months/year $8.23
Electricity Fees $4,425 - $ -
Natural Gas $1,495 264 MMBtu $5.66
TOTAL ENERGY COSTS $73,727
RECOMMENDED SAVINGS* $22,562 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,658
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$8,897
Cost:
-
$8,897 247,948 - - - - - - - - - - $8,897
247,948
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,828
Cost:
$9,500
$5,474 152,403 $1,354 157 - - - - - - - - $5,474
152,403
kWh
$1,354
157
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,958
Cost:
-
- - - - - - - - - - $2,958 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$2,958
-
$
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$2,118
Cost:
$6,350
$1,698 47,186 $420 49 - - - - - - - - $1,698
47,186
kWh
$420
49
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$584
Cost:
$238
$483 13,482 $101 12 - - - - - - - - $483
13,482
kWh
$101
12
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$138
Cost:
-
$112 3,224 $26 3 - - - - - - - - $112
3,224
kWh
$26
3
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$481
Cost:
-
- - - - $481 85 - - - - - - -
-
kWh
-
-
kW-months/year
$481
85
MMBtu
-
-
lb
-
-
$
-
-
$
08: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$397
Cost:
-
- - - - - - $517 14,960 $(-120) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$517
14,960
lb
$(-120)
-
$
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$161
Cost:
$640
$77 2,052 $84 10 - - - - - - - - $77
2,052
kWh
$84
10
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$22,562
Cost:
$16,728
$16,741 466,295 $1,985 231 $481 85 $517 14,960 $(-120) - $2,958 - $16,741
466,295
kWh
$1,985
231
kW-months/year
$481
85
MMBtu
$517
14,960
lb
$(-120)
-
$
$2,958
-
$
TOTAL IMPLEMENTED Savings:
$10,658
Cost:
$878
$9,569 266,706 $211 25 $481 85 $517 14,960 $(-120) - - - $9,569
266,706
kWh
$211
25
kW-months/year
$481
85
MMBtu
$517
14,960
lb
$(-120)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes