Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2001 |
Principal Product | Air Filters |
NAICS | n/a |
SIC | 3564 - Blowers And Fans |
Sales | $5,000,000-$10,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 120,176 |
Annual Production | 1,100,000 Pounds |
Production Hrs. Annual | 4,250 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $26,395 | 769,406 | kWh | $0.03 |
Electricity Demand | $25,613 | 3,826 | kW-months/year | $6.69 |
Electricity Fees | $5,305 | - | $ | - |
Natural Gas | $16,653 | 4,013 | MMBtu | $4.15 |
TOTAL ENERGY COSTS | $96,306 | |||
RECOMMENDED SAVINGS* | $20,903 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,140 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $11,007 Cost: - |
- | - | - | - | - | - | $11,007 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$11,007 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,031 Cost: $17,436 |
$2,070 | 57,181 | $961 | 136 | - | - | - | - |
$2,070 57,181 kWh |
$961 136 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,563 Cost: $1,800 |
$923 | 25,490 | $640 | 91 | - | - | - | - |
$923 25,490 kWh |
$640 91 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $320 Cost: $350 |
$320 | 8,874 | - | - | - | - | - | - |
$320 8,874 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR |
Savings: $2,257 Cost: $6,000 |
- | - | - | - | $2,257 | 544 | - | - |
- - kWh |
- - kW-months/year |
$2,257 544 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,627 Cost: $500 |
- | - | - | - | $1,627 | 392 | - | - |
- - kWh |
- - kW-months/year |
$1,627 392 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $935 Cost: $640 |
$682 | 18,838 | $253 | 36 | - | - | - | - |
$682 18,838 kWh |
$253 36 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $163 Cost: $60 |
$135 | 3,730 | $28 | 4 | - | - | - | - |
$135 3,730 kWh |
$28 4 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $20,903 Cost: $26,786 |
$4,130 | 114,113 | $1,882 | 267 | $3,884 | 936 | $11,007 | - | $4,130 114,113 kWh |
$1,882 267 kW-months/year |
$3,884 936 MMBtu |
$11,007 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,140 Cost: $8,150 |
$1,243 | 34,364 | $640 | 91 | $2,257 | 544 | - | - | $1,243 34,364 kWh |
$640 91 kW-months/year |
$2,257 544 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |