IAC logo
IAC Assessment: WI0396
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0396
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2001
Principal Product Flexible Packaging Products
NAICS n/a
SIC 2672 - Paper Coated And Laminated, Nec
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 133,000
Annual Production 0 Units
Production Hrs. Annual 8,760
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $197,751 7,182,022 kWh $0.03
Electricity Demand $152,319 16,502 kW-months/year $9.23
Electricity Fees $24,933 - $ -
Natural Gas $202,922 57,587 MMBtu $3.52
TOTAL ENERGY COSTS $577,925
RECOMMENDED SAVINGS* $242,156 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$172,934
Cost:
$560,000
$202,531 7,008,000 $93,024 9,600 $(-120,874) (-34,339) $(-1,747) - - - $202,531
7,008,000
kWh
$93,024
9,600
kW-months/year
$(-120,874)
(-34,339)
MMBtu
$(-1,747)
-
$
-
-
$
02: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$40,600
Cost:
$10,000
- - - - - - $40,600 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$40,600
-
$
-
-
$
03: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$11,777
Cost:
-
- - - - - - - - $11,777 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$11,777
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,365
Cost:
$4,500
$4,734 163,798 $1,631 168 - - - - - - $4,734
163,798
kWh
$1,631
168
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,350
Cost:
-
$1,004 34,732 $346 36 - - - - - - $1,004
34,732
kWh
$346
36
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,004
Cost:
$1,920
$3,588 124,164 $1,416 146 - - - - - - $3,588
124,164
kWh
$1,416
146
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,983
Cost:
$1,000
- - - - $3,983 1,131 - - - - -
-
kWh
-
-
kW-months/year
$3,983
1,131
MMBtu
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$143
Cost:
$30
$106 3,660 $37 4 - - - - - - $106
3,660
kWh
$37
4
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$242,156
Cost:
$577,450
$211,963 7,334,354 $96,454 9,954 $(-116,891) (-33,208) $38,853 - $11,777 - $211,963
7,334,354
kWh
$96,454
9,954
kW-months/year
$(-116,891)
(-33,208)
MMBtu
$38,853
-
$
$11,777
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes