IAC logo
IAC Assessment: WI0397
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0397
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2001
Principal Product Food Service Equipment
NAICS n/a
SIC 3589 - Service Industry Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 290
Plant Area (Sq.Ft.) 212,000
Annual Production 100,000 Pieces
Production Hrs. Annual 6,075
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,586 3,624,471 kWh $0.03
Electricity Demand $55,405 10,407 kW-months/year $5.32
Electricity Fees $18,972 - $ -
Natural Gas $45,257 8,962 MMBtu $5.05
TOTAL ENERGY COSTS $197,481
RECOMMENDED SAVINGS* $21,394 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,138
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
01: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$8,173
Cost:
-
- - - - - - - - $8,173 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$8,173
-
lb
-
-
$
-
-
$
02: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$3,674
Cost:
$7,700
- - - - - - $4,756 481 $(-288) (-161) $(-481) - $(-313) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,756
481
gal
$(-288)
(-161)
lb
$(-481)
-
$
$(-313)
-
$
03: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$3,585
Cost:
$10,000
- - - - $(-104) (-21) $4,289 2,121 - - $(-600) - - - -
-
kWh
-
-
kW-months/year
$(-104)
(-21)
MMBtu
$4,289
2,121
gal
-
-
lb
$(-600)
-
$
-
-
$
04: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$2,972
Cost:
$6,675
$2,972 92,022 - - - - - - - - - - - - $2,972
92,022
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,025
Cost:
$2,400
$427 13,222 $598 107 - - - - - - - - - - $427
13,222
kWh
$598
107
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$813
Cost:
-
$813 25,178 - - - - - - - - - - - - $813
25,178
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$650
Cost:
$640
$523 16,186 $127 23 - - - - - - - - - - $523
16,186
kWh
$127
23
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
08: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$502
Cost:
-
- - $502 101 - - - - - - - - - - -
-
kWh
$502
101
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$21,394
Cost:
$27,415
$4,735 146,608 $1,227 231 $(-104) (-21) $9,045 2,602 $7,885 (-161) $(-1,081) - $(-313) - $4,735
146,608
kWh
$1,227
231
kW-months/year
$(-104)
(-21)
MMBtu
$9,045
2,602
gal
$7,885
(-161)
lb
$(-1,081)
-
$
$(-313)
-
$
TOTAL IMPLEMENTED Savings:
$10,138
Cost:
$640
$1,336 41,364 $629 124 - - - - $8,173 - - - - - $1,336
41,364
kWh
$629
124
kW-months/year
-
-
MMBtu
-
-
gal
$8,173
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material