IAC Assessment: WI0404
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0404
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2001
Principal Product Envelopes and Stationery
NAICS n/a
SIC 2675 - Die-cut Paper And Board
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 121,250
Annual Production 400,000,000 Pieces
Production Hrs. Annual 2,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,593 1,025,680 kWh $0.04
Electricity Demand $45,565 5,047 kW-months/year $9.03
Electricity Fees $6,799 - $ -
TOTAL ENERGY COSTS $(-133,979)
RECOMMENDED SAVINGS* $18,503 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,135
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
01: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$12,000
Cost:
-
- - - - - - - - - - $12,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$12,000
-
$
02: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$3,918
Cost:
$14,500
$(-158) (-3,991) $(-229) (-24) - - - - $4,305 1,345,950 - - $(-158)
(-3,991)
kWh
$(-229)
(-24)
kW-months/year
-
-
$
-
-
MMBtu
$4,305
1,345,950
Tgal
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$798
Cost:
$2,400
$384 9,667 $414 43 - - - - - - - - $384
9,667
kWh
$414
43
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$728
Cost:
$1,190
$360 9,056 $368 39 - - - - - - - - $360
9,056
kWh
$368
39
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$668
Cost:
$1,600
$(-41) (-1,027) - - - - $709 84 - - - - $(-41)
(-1,027)
kWh
-
-
kW-months/year
-
-
$
$709
84
MMBtu
-
-
Tgal
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$256
Cost:
$640
$126 3,179 $130 14 - - - - - - - - $126
3,179
kWh
$130
14
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$135
Cost:
$400
- - - - $135 - - - - - - - -
-
kWh
-
-
kW-months/year
$135
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$18,503
Cost:
$20,730
$671 16,884 $683 72 $135 - $709 84 $4,305 1,345,950 $12,000 - $671
16,884
kWh
$683
72
kW-months/year
$135
-
$
$709
84
MMBtu
$4,305
1,345,950
Tgal
$12,000
-
$
TOTAL IMPLEMENTED Savings:
$12,135
Cost:
$400
- - - - $135 - - - - - $12,000 - -
-
kWh
-
-
kW-months/year
$135
-
$
-
-
MMBtu
-
-
Tgal
$12,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes