IAC logo
IAC Assessment: WI0413
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0413
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2002
Principal Product Plastic Wrapping Material
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 53,800
Annual Production 7,274,000 Pounds
Production Hrs. Annual 8,400
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $136,335 3,856,020 kWh $0.04
Electricity Demand $88,452 8,519 kW-months/year $10.38
Electricity Fees $18,880 - $ -
Natural Gas $222,544 38,024 MMBtu $5.85
TOTAL ENERGY COSTS $500,711
RECOMMENDED SAVINGS* $54,805 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $928
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 3.6122 INSTALL SOLID WASTE INCINERATOR FOR HEAT Savings:
$27,075
Cost:
$130,000
- - - - - - $27,075 5,700 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$27,075
5,700
lb
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$8,951
Cost:
$3,762
$6,737 208,880 $2,214 202 - - - - $6,737
208,880
kWh
$2,214
202
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$6,493
Cost:
$600
$(-281) (-7,546) - - $6,774 1,158 - - $(-281)
(-7,546)
kWh
-
-
kW-months/year
$6,774
1,158
MMBtu
-
-
lb
04: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$6,626
Cost:
$26,500
- - - - $6,626 11,326 - - -
-
kWh
-
-
kW-months/year
$6,626
11,326
MMBtu
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,732
Cost:
$25,405
$2,504 67,320 $2,228 173 - - - - $2,504
67,320
kWh
$2,228
173
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$928
Cost:
$640
$706 18,974 $222 20 - - - - $706
18,974
kWh
$222
20
kW-months/year
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$54,805
Cost:
$186,907
$9,666 287,628 $4,664 395 $13,400 12,484 $27,075 5,700 $9,666
287,628
kWh
$4,664
395
kW-months/year
$13,400
12,484
MMBtu
$27,075
5,700
lb
TOTAL IMPLEMENTED Savings:
$928
Cost:
$640
$706 18,974 $222 20 - - - - $706
18,974
kWh
$222
20
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)