IAC Assessment: WI0419
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0419
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2002
Principal Product Plastic Components
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 38,000
Annual Production 1,700,000 Pounds
Production Hrs. Annual 4,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,296 1,135,361 kWh $0.03
Electricity Demand $34,980 4,595 kW-months/year $7.61
Electricity Fees $21,083 - $ -
Natural Gas $28,950 8,206 MMBtu $3.53
TOTAL ENERGY COSTS $129,482
RECOMMENDED SAVINGS* $7,392 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,709
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,499
Cost:
$1,000
- - - - $2,499 707 - - -
-
kWh
-
-
kW-months/year
$2,499
707
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,839
Cost:
$5,926
$1,174 36,816 $665 83 - - - - $1,174
36,816
kWh
$665
83
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,475
Cost:
$60
$941 29,489 $534 66 - - - - $941
29,489
kWh
$534
66
kW-months/year
-
-
MMBtu
-
-
lb
04: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$683
Cost:
$500
- - - - - - $683 27 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$683
27
lb
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$424
Cost:
$39
- - - - $424 120 - - -
-
kWh
-
-
kW-months/year
$424
120
MMBtu
-
-
lb
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$173
Cost:
-
$108 3,370 $65 8 - - - - $108
3,370
kWh
$65
8
kW-months/year
-
-
MMBtu
-
-
lb
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$299
Cost:
$700
$230 7,200 $69 9 - - - - $230
7,200
kWh
$69
9
kW-months/year
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$7,392
Cost:
$8,225
$2,453 76,875 $1,333 166 $2,923 827 $683 27 $2,453
76,875
kWh
$1,333
166
kW-months/year
$2,923
827
MMBtu
$683
27
lb
TOTAL IMPLEMENTED Savings:
$6,709
Cost:
$7,725
$2,453 76,875 $1,333 166 $2,923 827 - - $2,453
76,875
kWh
$1,333
166
kW-months/year
$2,923
827
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)