IAC logo
IAC Assessment: WI0422
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0422
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2002
Principal Product Papaerboard
NAICS n/a
SIC 2631 - Paperboard Mills
Sales $50,000,000-$100,000,000
# of Employees 170
Plant Area (Sq.Ft.) 554,250
Annual Production 324,000,000 Pounds
Production Hrs. Annual 8,520
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,656,743 66,352,418 kWh $0.02
Electricity Demand $104,185 109,719 kW-months/year $0.95
Electricity Fees $260,760 - $ -
Natural Gas $4,891,208 770,553 MMBtu $6.35
TOTAL ENERGY COSTS $6,951,280
RECOMMENDED SAVINGS* $203,897 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,645
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$107,793
Cost:
$715,000
$123,420 4,675,000 $127,908 13,200 $(-143,535) (-22,604) - - - - $123,420
4,675,000
kWh
$127,908
13,200
kW-months/year
$(-143,535)
(-22,604)
MMBtu
-
-
Tgal
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$51,405
Cost:
$31,028
$32,706 1,237,524 $18,699 1,900 - - - - - - $32,706
1,237,524
kWh
$18,699
1,900
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 3.3132 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL Savings:
$37,726
Cost:
$40,000
- - - - - - $38,376 18,000,000 $(-650) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$38,376
18,000,000
Tgal
$(-650)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,645
Cost:
$21,689
$4,744 179,712 $1,901 187 - - - - - - $4,744
179,712
kWh
$1,901
187
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$328
Cost:
-
$234 8,986 $94 10 - - - - - - $234
8,986
kWh
$94
10
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$203,897
Cost:
$807,717
$161,104 6,101,222 $148,602 15,297 $(-143,535) (-22,604) $38,376 18,000,000 $(-650) - $161,104
6,101,222
kWh
$148,602
15,297
kW-months/year
$(-143,535)
(-22,604)
MMBtu
$38,376
18,000,000
Tgal
$(-650)
-
$
TOTAL IMPLEMENTED Savings:
$6,645
Cost:
$21,689
$4,744 179,712 $1,901 187 - - - - - - $4,744
179,712
kWh
$1,901
187
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes