Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2002
Principal Product Recondition Containers
NAICS n/a
SIC 2449 - Wood Containers, Nec
Sales $10,000,000-$50,000,000
# of Employees 82
Plant Area (Sq.Ft.) 125,000
Annual Production 2,600,000 Pieces
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,030 1,719,298 kWh $0.03
Electricity Demand $30,783 5,923 kW-months/year $5.20
Electricity Fees $6,826 - $ -
Natural Gas $212,455 36,351 MMBtu $5.84
TOTAL ENERGY COSTS $353,051
RECOMMENDED SAVINGS* $48,131 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,148
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 3.3132 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL Savings:
$14,059
Cost:
$20,000
- - - - - - $15,359 416,200 $(-1,300) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$15,359
416,200
Tgal
$(-1,300)
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$10,458
Cost:
$500
- - - - $10,458 1,791 - - - - -
-
kWh
-
-
kW-months/year
$10,458
1,791
MMBtu
-
-
Tgal
-
-
$
03: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$9,308
Cost:
$11,000
- - - - $(-1,022) (-175) $9,000 18,000 $1,330 - -
-
kWh
-
-
kW-months/year
$(-1,022)
(-175)
MMBtu
$9,000
18,000
Tgal
$1,330
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$6,599
Cost:
$12,000
- - - - $6,599 1,130 - - - - -
-
kWh
-
-
kW-months/year
$6,599
1,130
MMBtu
-
-
Tgal
-
-
$
05: 2.2514 COVER OPEN TANKS Savings:
$3,017
Cost:
$864
- - - - $3,017 517 - - - - -
-
kWh
-
-
kW-months/year
$3,017
517
MMBtu
-
-
Tgal
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,966
Cost:
$5,584
$2,358 73,920 $608 111 - - - - - - $2,358
73,920
kWh
$608
111
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,365
Cost:
$2,500
$960 30,091 $405 85 - - - - - - $960
30,091
kWh
$405
85
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$359
Cost:
$369
$286 8,952 $73 13 - - - - - - $286
8,952
kWh
$73
13
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$48,131
Cost:
$52,817
$3,604 112,963 $1,086 209 $19,052 3,263 $24,359 434,200 $30 - $3,604
112,963
kWh
$1,086
209
kW-months/year
$19,052
3,263
MMBtu
$24,359
434,200
Tgal
$30
-
$
TOTAL IMPLEMENTED Savings:
$15,148
Cost:
$8,953
$3,604 112,963 $1,086 209 $10,458 1,791 - - - - $3,604
112,963
kWh
$1,086
209
kW-months/year
$10,458
1,791
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes