IAC logo
IAC Assessment: WI0431
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0431
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2002
Principal Product Seating
NAICS n/a
SIC 2531 - Public Building & Related Furniture
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 40,000
Annual Production 30,000 Pieces
Production Hrs. Annual 4,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,304 744,800 kWh $0.03
Electricity Demand $25,194 2,752 kW-months/year $9.15
Electricity Fees $5,174 - $ -
Natural Gas $16,472 2,550 MMBtu $6.46
TOTAL ENERGY COSTS $81,072
RECOMMENDED SAVINGS* $12,914 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,483
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$7,907
Cost:
$13,000
$(-1,022) (-14,920) - - - - $8,929 3,434,000 $(-1,022)
(-14,920)
kWh
-
-
kW-months/year
-
-
MMBtu
$8,929
3,434,000
Tgal
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,742
Cost:
$600
- - - - $1,742 270 - - -
-
kWh
-
-
kW-months/year
$1,742
270
MMBtu
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,532
Cost:
$5,000
$799 22,380 $733 67 - - - - $799
22,380
kWh
$733
67
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$623
Cost:
$300
$308 8,640 $315 29 - - - - $308
8,640
kWh
$315
29
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$205
Cost:
-
$107 3,008 $98 9 - - - - $107
3,008
kWh
$98
9
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$369
Cost:
$525
$369 10,340 - - - - - - $369
10,340
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$282
Cost:
$640
$167 4,676 $115 11 - - - - $167
4,676
kWh
$115
11
kW-months/year
-
-
MMBtu
-
-
Tgal
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$254
Cost:
$90
$150 1,460 $104 10 - - - - $150
1,460
kWh
$104
10
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$12,914
Cost:
$20,155
$878 35,584 $1,365 126 $1,742 270 $8,929 3,434,000 $878
35,584
kWh
$1,365
126
kW-months/year
$1,742
270
MMBtu
$8,929
3,434,000
Tgal
TOTAL IMPLEMENTED Savings:
$2,483
Cost:
$1,330
$424 9,144 $317 30 $1,742 270 - - $424
9,144
kWh
$317
30
kW-months/year
$1,742
270
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal