IAC logo
IAC Assessment: WI0435
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0435
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2003
Principal Product homogenizer
NAICS 333241 - Food Product Machinery Manufacturing
SIC 3556 - Food Products Machinery
Sales $10,000,000-$50,000,000
# of Employees 133
Plant Area (Sq.Ft.) 455,000
Annual Production 75 Pieces
Production Hrs. Annual 2,125
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $257,167 8,268,811 kWh $0.03
Electricity Demand $123,615 17,731 kW-months/year $6.97
Electricity Fees $18,847 - $ -
Natural Gas $111,061 24,195 MMBtu $4.59
TOTAL ENERGY COSTS $510,690
RECOMMENDED SAVINGS* $157,786 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,309
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$149,500
Cost:
$120,000
- - - - - - $149,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$149,500
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,988
Cost:
-
- - $3,988 497 - - - - -
-
kWh
$3,988
497
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,286
Cost:
$10,000
- - - - $2,286 498 - - -
-
kWh
-
-
kW-months/year
$2,286
498
MMBtu
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,321
Cost:
$5,000
$1,321 40,284 - - - - - - $1,321
40,284
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$691
Cost:
$640
$362 11,033 $329 41 - - - - $362
11,033
kWh
$329
41
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$157,786
Cost:
$135,640
$1,683 51,317 $4,317 538 $2,286 498 $149,500 - $1,683
51,317
kWh
$4,317
538
kW-months/year
$2,286
498
MMBtu
$149,500
-
$
TOTAL IMPLEMENTED Savings:
$5,309
Cost:
$5,000
$1,321 40,284 $3,988 497 - - - - $1,321
40,284
kWh
$3,988
497
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes