IAC logo
IAC Assessment: WI0436
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0436
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2003
Principal Product Injection Molded Plastic
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 37,500
Annual Production 650,000 Units
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $86,603 2,410,349 kWh $0.04
Electricity Demand $75,406 7,151 kW-months/year $10.54
Electricity Fees $14,303 - $ -
Natural Gas $3,113 542 MMBtu $5.74
TOTAL ENERGY COSTS $187,101
RECOMMENDED SAVINGS* $37,095 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $119
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$28,363
Cost:
$102,600
$28,363 748,406 - - - - - - $28,363
748,406
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$3,768
Cost:
$200
- - - - - - $3,768 625,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,768
625,000
Tgal
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,276
Cost:
$1,424
- - - - $3,276 571 - - -
-
kWh
-
-
kW-months/year
$3,276
571
MMBtu
-
-
Tgal
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$861
Cost:
$800
- - - - $861 150 - - -
-
kWh
-
-
kW-months/year
$861
150
MMBtu
-
-
Tgal
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$496
Cost:
$225
$115 3,030 $381 34 - - - - $115
3,030
kWh
$381
34
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$212
Cost:
$272
$118 3,108 $94 8 - - - - $118
3,108
kWh
$94
8
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$119
Cost:
$34
$67 2,370 $52 5 - - - - $67
2,370
kWh
$52
5
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$37,095
Cost:
$105,555
$28,663 756,914 $527 47 $4,137 721 $3,768 625,000 $28,663
756,914
kWh
$527
47
kW-months/year
$4,137
721
MMBtu
$3,768
625,000
Tgal
TOTAL IMPLEMENTED Savings:
$119
Cost:
$34
$67 2,370 $52 5 - - - - $67
2,370
kWh
$52
5
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal