IAC Assessment: WI0442
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0442
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2003
Principal Product Aluminum Beverage Cans
NAICS 332431 - Metal Can Manufacturing
SIC 3411 - Metal Cans
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 1,800,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $901,448 22,914,965 kWh $0.04
Electricity Demand $34,723 36,684 kW-months/year $0.95
Electricity Fees $55,542 - $ -
Natural Gas $380,922 80,237 MMBtu $4.75
TOTAL ENERGY COSTS $1,372,635
RECOMMENDED SAVINGS* $215,328 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$188,665
Cost:
$146,300
$352,968 9,240,000 $113,520 13,200 $(-277,823) (-58,489) $352,968
9,240,000
kWh
$113,520
13,200
kW-months/year
$(-277,823)
(-58,489)
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$16,332
Cost:
$6,498
$12,926 338,386 $3,406 396 - - $12,926
338,386
kWh
$3,406
396
kW-months/year
-
-
MMBtu
03: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$5,132
Cost:
-
- - $5,132 597 - - -
-
kWh
$5,132
597
kW-months/year
-
-
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,640
Cost:
$10,000
- - - - $2,640 556 -
-
kWh
-
-
kW-months/year
$2,640
556
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,559
Cost:
$500
- - - - $2,559 539 -
-
kWh
-
-
kW-months/year
$2,559
539
MMBtu
TOTAL RECOMMENDED Savings:
$215,328
Cost:
$163,298
$365,894 9,578,386 $122,058 14,193 $(-272,624) (-57,394) $365,894
9,578,386
kWh
$122,058
14,193
kW-months/year
$(-272,624)
(-57,394)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas