IAC Assessment: WI0444
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0444
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2003
Principal Product Industrial Machining
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 36,000
Annual Production 1,200,000 Pieces
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $61,894 1,478,883 kWh $0.04
Electricity Demand $27,659 2,811 kW-months/year $9.84
Electricity Fees $34,693 - $ -
Natural Gas $3,026 478 MMBtu $6.33
TOTAL ENERGY COSTS $136,472
RECOMMENDED SAVINGS* $22,943 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,769
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$6,597
Cost:
$9,000
- - - - $(-283) (-45) $8,280 5,963 $(-1,400) - -
-
kWh
-
-
kW-months/year
$(-283)
(-45)
MMBtu
$8,280
5,963
gal
$(-1,400)
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$4,807
Cost:
$7,500
$4,807 108,767 - - - - - - - - $4,807
108,767
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,189
Cost:
$8,655
$2,779 62,874 $1,410 129 - - - - - - $2,779
62,874
kWh
$1,410
129
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,383
Cost:
$2,000
- - - - $3,383 534 - - - - -
-
kWh
-
-
kW-months/year
$3,383
534
MMBtu
-
-
gal
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,301
Cost:
$1,424
- - - - $2,301 364 - - - - -
-
kWh
-
-
kW-months/year
$2,301
364
MMBtu
-
-
gal
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$983
Cost:
$740
$717 16,223 $266 24 - - - - - - $717
16,223
kWh
$266
24
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$683
Cost:
$600
- - - - $683 108 - - - - -
-
kWh
-
-
kW-months/year
$683
108
MMBtu
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$22,943
Cost:
$29,919
$8,303 187,864 $1,676 153 $6,084 961 $8,280 5,963 $(-1,400) - $8,303
187,864
kWh
$1,676
153
kW-months/year
$6,084
961
MMBtu
$8,280
5,963
gal
$(-1,400)
-
$
TOTAL IMPLEMENTED Savings:
$11,769
Cost:
$18,395
$3,496 79,097 $1,676 153 $(-283) (-45) $8,280 5,963 $(-1,400) - $3,496
79,097
kWh
$1,676
153
kW-months/year
$(-283)
(-45)
MMBtu
$8,280
5,963
gal
$(-1,400)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes