Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2003
Principal Product Metal Cans
NAICS 332431 - Metal Can Manufacturing
SIC 3411 - Metal Cans
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 80,000
Annual Production 0 Pounds
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $204,335 6,815,077 kWh $0.03
Electricity Demand $127,396 14,086 kW-months/year $9.04
Electricity Fees $13,555 - $ -
Natural Gas $406,731 64,109 MMBtu $6.34
TOTAL ENERGY COSTS $762,617
RECOMMENDED SAVINGS* $93,859 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,162
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$47,771
Cost:
$18,500
- - - - $47,771 7,535 - - -
-
kWh
-
-
kW-months/year
$47,771
7,535
MMBtu
-
-
Tgal
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$22,445
Cost:
$40,000
$33,699 1,063,050 $19,463 2,038 $(-30,717) (-4,845) - - $33,699
1,063,050
kWh
$19,463
2,038
kW-months/year
$(-30,717)
(-4,845)
MMBtu
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,041
Cost:
$18,315
$7,513 237,018 $4,528 474 - - - - $7,513
237,018
kWh
$4,528
474
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$3,824
Cost:
$8,700
$(-1,137) (-22,380) - - - - $4,961 1,560,000 $(-1,137)
(-22,380)
kWh
-
-
kW-months/year
-
-
MMBtu
$4,961
1,560,000
Tgal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,121
Cost:
$1,280
$2,147 67,724 $974 102 - - - - $2,147
67,724
kWh
$974
102
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$4,657
Cost:
$20,000
$2,906 91,665 $1,751 183 - - - - $2,906
91,665
kWh
$1,751
183
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$93,859
Cost:
$106,795
$45,128 1,437,077 $26,716 2,797 $17,054 2,690 $4,961 1,560,000 $45,128
1,437,077
kWh
$26,716
2,797
kW-months/year
$17,054
2,690
MMBtu
$4,961
1,560,000
Tgal
TOTAL IMPLEMENTED Savings:
$15,162
Cost:
$19,595
$9,660 304,742 $5,502 576 - - - - $9,660
304,742
kWh
$5,502
576
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal