IAC logo
IAC Assessment: WI0455
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0455
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2003
Principal Product Pipe Fabrications
NAICS 332996 - Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498 - Fabricated Pipe And Fittings
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 90,000
Annual Production 25,000,000 Pounds
Production Hrs. Annual 3,800
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,600 2,080,720 kWh $0.02
Electricity Demand $25,111 6,094 kW-months/year $4.12
Electricity Fees $25,148 - $ -
Natural Gas $48,730 80,237 MMBtu $0.61
TOTAL ENERGY COSTS $146,589
RECOMMENDED SAVINGS* $35,635 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,710
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$17,710
Cost:
$2,500
- - - - - - $17,710 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$17,710
-
$
02: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$12,503
Cost:
$2,000
- - - - $12,503 1,687 - - -
-
kWh
-
-
kW-months/year
$12,503
1,687
MMBtu
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,687
Cost:
$1,000
- - - - $1,687 220 - - -
-
kWh
-
-
kW-months/year
$1,687
220
MMBtu
-
-
$
04: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER Savings:
$1,787
Cost:
-
$1,191 49,609 $596 224 - - - - $1,191
49,609
kWh
$596
224
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,232
Cost:
$1,240
$767 31,951 $465 118 - - - - $767
31,951
kWh
$465
118
kW-months/year
-
-
MMBtu
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$716
Cost:
-
- - $716 181 - - - - -
-
kWh
$716
181
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$35,635
Cost:
$6,740
$1,958 81,560 $1,777 523 $14,190 1,907 $17,710 - $1,958
81,560
kWh
$1,777
523
kW-months/year
$14,190
1,907
MMBtu
$17,710
-
$
TOTAL IMPLEMENTED Savings:
$17,710
Cost:
$2,500
- - - - - - $17,710 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$17,710
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material