IAC logo
IAC Assessment: WI0463
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0463
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2004
Principal Product Blinds
NAICS 337920 - Blind and Shade Manufacturing
SIC 2591 - Drapery Hardware & Blinds & Shades
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 250,000
Annual Production 420,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $554,870 15,684,787 kWh $0.04
Electricity Demand $286,959 30,181 kW-months/year $9.51
Electricity Fees $53,929 - $ -
Natural Gas $304,940 41,853 MMBtu $7.29
TOTAL ENERGY COSTS $1,350,284
RECOMMENDED SAVINGS* $148,891 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$75,927
Cost:
$18,500
$(-4,854) (-930,996) - - - - $80,781 34,670,000 $(-4,854)
(-930,996)
kWh
-
-
kW-months/year
-
-
MMBtu
$80,781
34,670,000
Tgal
02: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$17,690
Cost:
$17,690
- - - - $17,690 2,427 - - -
-
kWh
-
-
kW-months/year
$17,690
2,427
MMBtu
-
-
Tgal
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$15,360
Cost:
$2,000
- - - - $15,360 2,108 - - -
-
kWh
-
-
kW-months/year
$15,360
2,108
MMBtu
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,859
Cost:
$29,148
$10,002 268,162 $3,857 383 - - - - $10,002
268,162
kWh
$3,857
383
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$11,920
Cost:
$12,595
$11,920 319,586 - - - - - - $11,920
319,586
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$7,605
Cost:
$840
$5,231 140,245 $2,374 236 - - - - $5,231
140,245
kWh
$2,374
236
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,530
Cost:
$15,200
$6,530 175,104 - - - - - - $6,530
175,104
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$148,891
Cost:
$95,973
$28,829 (-27,899) $6,231 619 $33,050 4,535 $80,781 34,670,000 $28,829
(-27,899)
kWh
$6,231
619
kW-months/year
$33,050
4,535
MMBtu
$80,781
34,670,000
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal